Before you choose the property
Start with the rules that actually shape the project.
Current scheme located: Mukhyamantri Homestay Protsahan Yojana 2026, issued 18 June 2026, repealing Resolution No.3644 dated 06 August 2024.
Current geographic scope: 34 listed tourist places in 16 districts, within 5 km.
Homestay: maximum eight rooms; owner need not reside on premises.
Scope: Source-checked regulatory and business-planning guidance. It does not approve a particular title, building, tax position, food activity or operating structure.
01 / Executive finding
The practical starting point
- The current Bihar-specific controlling instrument located is the Mukhyamantri Homestay Protsahan Yojana 2026, issued by the Government of Bihar, Tourism Department on 18 June 2026. The resolution states that the earlier departmental Resolution No. 3644 dated 06 August 2024 is repealed. The 2026 instrument is effective from the date of the resolution and was ordered to be published in the Bihar Gazette; a separate Gazette publication copy was Not stated in the current official material reviewed. [S1, resolution pp. 1–2]
- The scheme is not statewide. It initially applies to 34 specified tourist places in 16 districts, and a homestay must be situated within a 5-km radius of one of those listed places. The Tourism Department reserves power to amend the destination list. [S1, cls. 2.1(e)–(f), Annexure pp. 2–3]
- The published definition allows a maximum of eight rooms in the accommodation unit, and expressly says that the owner is not required to reside in the premises. If the accommodation unit has more than eight rooms, the scheme says it will not be treated as a homestay. A separate maximum-bed or maximum-guest figure was Not stated in the material reviewed. [S1, cl. 2.1(a), Annexure p. 2]
- The 2026 scheme expressly excludes resorts, hotels, motels, guest houses and boarding/lodging houses from its homestay scope. Farm stays appear separately in Bihar's general tourism-policy incentive material; the located 2024 tourism-policy guidelines do not list ordinary homestays in that separate eligible-project schedule. [S1, resolution p. 1; S6, relevant eligible-project schedule; S7, eligible-project list]
- There is no express Bihar-domicile or permanent-resident certificate requirement in the controlling 2026 scheme that was located. The official English implementation page describes enabling “residents” to offer accommodation, but the controlling Hindi instrument instead specifies Aadhaar, PAN, an Aadhaar-linked bank account and qualifying property rights. Therefore a legal “Bihar domicile” requirement should not be published without further authority confirmation. [S1, cl. 2.2(c); S2, implementation page]
- Ownership is not the only tenure route. For the scheme/incentive route, the applicant must have clear ownership or a valid lease of at least ten years over the proposed homestay property; joint ownership requires written NOC from all co-owners. The property must also be free from the specified dispute/encumbrance problem. [S1, cls. 2.2(e)–(f), Annexure p. 4]
- The scheme does not expressly establish a company, LLP, partnership, trust, society, professional manager or caretaker as an eligible registration holder. Its identity-document structure is individual-oriented, while SHGs are mentioned for an additional incentive. Whether an entity may hold the registration, or whether the registration holder and operating/management entity may differ, therefore requires a written answer from the Tourism Department. [S1, cls. 2.2(c), 4.1; pp. 4, 16–17]
- The homestay application fee is ₹2,000 and is expressly non-refundable. The verified renewal fee is ₹1,000. No separate classification fee or inspection fee was located in the 2026 scheme. [S1, cls. 2.6.2–2.6.5, pp. 10–12; cl. 2.6.7, p. 13]
- Registration is stated to remain valid for five years from the “Commercial Operation Date” (COD). Renewal requires a fresh prescribed online process before expiry and payment of ₹1,000, but the scheme does not specify a fixed 30/60/90-day renewal window. [S1, cl. 2.6.7, Annexure p. 13]
- The scheme prescribes a 60-day registration process, but this is not a guarantee of approval. The regional/district committee is to send its inspection report within 30 days of receiving the application; the departmental committee is to report to the Director within 15 days after receiving that report; the process is stated to be completed within 60 days from receipt of application. Missing documents, clarifications, inspection findings and refusal remain possible. [S1, cl. 3 and committee procedure, Annexure p. 16]
- There is a material unresolved internal deadline conflict. One clause gives a PRC holder 12 months to complete construction, with a possible extension of no more than six months; another clause in the same instrument gives a new proposed project 24 months, while keeping 12 months for upgradation/existing units. The official sources are not aligned. New-build applicants should obtain a written interpretation before relying on either deadline. [S1, cls. 2.6.6(b)–(c) and 2.6.6(f), Annexure pp. 12–13]
- Financial assistance is substantial but not automatic: up to ₹2.5 lakh per eligible room or actual approved-design expenditure, whichever is lower, for up to four rooms, ordinarily capped at ₹10 lakh; qualifying women, SHGs and youth aged 18–25 can receive an additional ₹25,000 per room, producing a stated maximum of ₹11 lakh. Payment is staged 50% at COD, 25% after one year and 25% after two years. [S1, cl. 4.1, pp. 16–17]
- An incentive beneficiary is exposed to a five-year operation commitment and recovery risk. Early closure can trigger recovery ranging from 100% during months 0–12 to 10% during months 49–60, with 9% simple annual interest, backed by an affidavit on ₹1,000 stamp paper. [S1, cl. 4.4 and recovery table, pp. 18–20]
- Foreign-guest reporting language in the Bihar scheme is not fully aligned with current central law. Bihar refers to local-police reporting in “Form C”; the Immigration and Foreigners Rules, 2025, effective 1 September 2025, require accommodation keepers expressly including homestays to transmit Form III [Earlier Form C] electronically within 24 hours of arrival and departure and retain prescribed electronic particulars for at least one year. The national duty is clear; whether Bihar additionally expects a separate local-police submission should be confirmed. [S1, cl. 2.5.1; S10, r.17 and Form III]
02 / Document chronology
Use the current rules and implementation
- 2010–2011 — Bihar agricultural land-conversion framework. BiharBhumi identifies the Bihar Agricultural Land (Conversion for Non-Agricultural Purposes) Act, 2010 and Rules, 2011 as the land-conversion framework, with the Sub-Divisional Officer as competent authority. It is separate from tourism registration. [S17]
- 08 December 2014 — Bihar Building Bye-Laws, 2014. Notification 578 made the bye-laws applicable to specified municipal/planning areas. The current PMAA page also publishes subsequent amendments. [S19]
- 2022 — Bihar Building (Amendment) Bye-Laws, 2022. A later amendment modifies the 2014 building framework. [S19]
- 27 December 2023 — Bihar Tourism Policy 2023 framework. The policy creates a broader investment/incentive framework. Its separate rural-tourism/farm-stay project category should not be merged with the 2026 homestay scheme. [S6–S7]
- 2024 — Bihar Tourism Policy Guidelines. The amended guidelines located for the broader tourism policy identify eligible project classes, including rural tourism/tourist village/cultural village/farm stay. Ordinary homestay was not located in that schedule. [S7]
- 06 August 2024 — previous Mukhyamantri Homestay/Bed & Breakfast instrument. Current S1 expressly identifies Departmental Resolution No. 3644 dated 06.08.2024 and repeals it. The complete prior instrument was not relied upon as current law. [S1, resolution p.2]
- 01 September 2025 — Immigration and Foreigners Rules, 2025. G.S.R. 596(E) superseded prior specified foreigner-registration rules and introduced current Rule 17/Form III accommodation reporting. [S10, Gazette p.1, r.1; p.28 r.17]
- 04 October 2025 — further Bihar Building (Amendment) instrument. Notification No. 10713 modifies the amended building framework. This confirms that pre-development work should not rely on the 2014 text in isolation. [S19]
- 10–13 March 2026 — FSSAI amendments/revised thresholds. FSSAI's 13 March order expressly supersedes earlier food-business turnover thresholds, effective 01 April 2026. [S12]
- 17 June 2026 — Cabinet approval recorded in S1. The scheme resolution says Cabinet approval occurred at the meeting dated 17 June 2026, item 09. [S1, resolution p.2]
- 18 June 2026 — current Mukhyamantri Homestay Protsahan Yojana 2026 issued. S1 repeals the 2024 resolution, sets the current route and orders publication in the extraordinary Bihar Gazette. [S1, resolution pp.1–2]
- 03 August 2026 — Bihar Tourism website current update date. The official English scheme page links the 2026 PDF and Tourism Services Portal. [S2]
Supersession conclusion
The 2024 homestay/B&B resolution is expressly repealed by S1. It must not be described as current. S1 contains limited transitional/legacy language permitting homestays registered under the new scheme to obtain benefits under earlier provisions, but that language does not revive the prior eligibility or registration rules generally. No later Bihar Tourism amendment/corrigendum expressly modifying S1 was located as of the review date. A separately downloadable Bihar Gazette publication corresponding to S1 was Not stated in the current official material reviewed.
03 / Category definitions
Choose the right accommodation category
| Category | Location | Eligible owner/applicant | Residence requirement | Operator allowed | Capacity | Food position | Source |
|---|---|---|---|---|---|---|---|
| Homestay — 2026 scheme | Within 5 km of one of 34 listed tourist places in 16 districts | Owner or qualifying ≥10-year lessee is expressly contemplated; entity-holder questions unresolved | Owner need not reside at premises | Separate professional operator/management company NOT EXPRESSLY ADDRESSED | Maximum 8 rooms in accommodation unit; bed limit Not stated in the material reviewed | Clean/safe kitchen and local-food expectations in standards; FSSAI is separate | [S1, cls.2.1(a), 2.1(e)–(f), 2.2(e), 2.5.2–2.5.3] |
| Bed & Breakfast / BnB | S2 uses “Homestay / BnB units” | NOT separately defined in 2026 controlling instrument | NOT separately stated | Not stated in the material reviewed | NOT separately stated | Not stated in the material reviewed | The official sources are not aligned: S2 uses BnB wording; S1 repeals the 2024 Homestay/B&B regime without creating a separate 2026 B&B definition. [S1; S2 lines 104–130] |
| Hotel | Separate accommodation category | Separate route; not established by S1 | Not stated in the material reviewed for hotel route in this guide | Separate regime | Not stated in the material reviewed here | Separate FSSAI/GST consequences as applicable | S1 expressly says 2026 homestay scheme does not apply to hotels. [S1 resolution p.1] |
| Resort | Separate accommodation category | Separate route | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Expressly excluded from S1 homestay scope. [S1, resolution p.1] |
| Motel | Separate accommodation category | Separate route | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Expressly excluded from S1. [S1, resolution p.1] |
| Guest house | Separate accommodation category | Separate route | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | May have separate FSSAI treatment depending operations | Expressly excluded from S1. [S1, resolution p.1] |
| Boarding/lodging house | Separate accommodation category | Separate route | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | FoSCoS separately mentions boarding houses serving food | Expressly excluded from S1; [S14, Food Services p.7] for food categorisation. |
| Farm stay | Broader tourism-policy project category | Eligibility governed by separate Bihar Tourism Policy/Guidelines | Not stated in the material reviewed in sources reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Listed with Rural Tourism/Tourist Village/Cultural Village/Farm Stay under separate policy incentive material; not automatically a 2026 homestay. [S6–S7] |
| Serviced accommodation/service apartment | Not stated in the current official material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Written classification advice required if this is the intended model. |
The 34 currently listed tourist places
The official Hindi schedule lists the following 34 locations; English names below are research transliterations and the Hindi schedule controls. [S1, cl.2.1(e), Annexure pp.2–3]
| District | Listed tourism places |
|---|---|
| Gaya | Mahabodhi Temple/Bodh Gaya; Vishnupad Mandir; Dungeshwari Mandir; Pretshila; Gurpa Hill |
| Aurangabad | Deo Sun Temple |
| Rohtas | Sher Shah Suri Tomb; Manjhar Kund; Dhua Kund |
| Kaimur | Mundeshwari Temple area; Karamchat Dam |
| Nalanda | Jal Mandir, Pawapuri; Archaeological remains of Nalanda Mahavihara; Rajgir Ropeway; Zoo Safari/Nature Safari Rajgir; Rajgir Kund |
| Sitamarhi | Punaura Dham; Panth Pakar |
| Bhagalpur | Vikramshila University remains |
| Vaishali | Vishwa Shanti Stupa |
| West Champaran | Gandhi Ashram Bhitiharwa; Valmiki Tiger Reserve; Amwa Man |
| Banka | Mandar Parvat; Odhni Dam |
| Jamui | Jain Mandir Lachhuar; Nagi–Nakti Dam |
| Munger | Bhimbandh Wildlife Sanctuary |
| Jehanabad | Barabar Caves |
| Nawada | Kakolat Waterfall |
| East Champaran | Kesaria Stupa; Sita Kund |
| Muzaffarpur | Manikaman Jheel; Garibnath Dham |
Practical consequence: a property in Patna, Darbhanga or another unlisted destination does not fit the presently published geographic scope merely because tourism exists there.
04 / Eligibility decision tree
Check whether the applicant and property qualify
Start with the exact property address and local-body category.
- Is the property within 5 km of one of the 34 destinations listed in S1?
- No: does not appear to fit the published homestay definition under the presently published 2026 scheme, unless the Department has subsequently amended the list.
- Uncertain because the 5-km radius boundary has not been officially mapped: obtain coordinates and written district/Department confirmation → Confirm this in writing with the authority.
- Yes: continue. [S1, cl.2.1(e)–(f)]
- What is the property ownership/lease position?
- Clear sole ownership → continue.
- Joint ownership → obtain written NOC from every co-owner → continue. [S1, cl.2.2(f)]
- Registered/valid lease of at least 10 years → potentially supported for scheme route → continue. [S1, cl.2.2(e)]
- Lease shorter than 10 years → This does not appear to fit the published route for the published incentive route.
- Informal possession, licence, management agreement only, disputed title or unresolved encumbrance → Confirm this in writing with the authority / may fail the published tenure requirement.
- Who is the applicant?
- Individual owner/qualifying lessee with Aadhaar, PAN and Aadhaar-linked bank account → continue.
- Company, LLP, partnership, trust or society → Confirm this in writing with the authority.
- SHG → additional incentive is expressly contemplated, but whether the SHG itself or an individual member must be registration holder is not explicit → Confirm this in writing with the authority.
- State/Central government employee/appointed/contract worker seeking scheme benefit → scheme says such person is not eligible for scheme benefit; whether a registration-only route survives is not explicit → Confirm this in writing with the authority. [S1, cl.2.2(d)]
- Does the applicant have to be Bihar-domiciled?
- A legal domicile certificate requirement is Not stated in the material reviewed.
- Do not reject or approve based on domicile without Department clarification → Not established in the published material.
- Who will live at the property?
- Owner resident → permitted by definition.
- Owner lives elsewhere → expressly not disqualifying; continue. [S1, cl.2.1(a)]
- Only caretaker/staff live there → residence itself is not prohibited, but caretaker as registration holder is not established → Confirm this in writing with the authority if caretaker is intended to hold legal responsibility.
- Who will operate it?
- Registration-holder owner/lessee directly operates → closest fit to published structure.
- Separate professional management company handles bookings, employees and guest operations → the scheme does not expressly define this split → Confirm this in writing with the authority.
- Company wants to be registration holder while property owner is an individual → Confirm this in writing with the authority.
- A management agreement alone does not satisfy title/qualifying lease requirements.
- How many rooms are in the accommodation unit?
- 1–8 rooms → may fit; minimum number was not located.
- More than 8 total rooms in the accommodation unit → does not appear to fit the published homestay definition.
- Building has more than 8 rooms but only 8 will be offered to guests → wording appears to count accommodation-unit rooms rather than only letting rooms; Confirm this in writing with the authority.
- How many beds/guests are planned?
- No published maximum-bed/guest-capacity rule was located → Not established in the published material.
- Do not create a bed cap from another state's rules.
- Is the building existing, proposed, under construction or already running?
- Existing home converted/upgraded → expressly contemplated → This appears to fit the published route, subject to the remaining checks, subject to all other conditions. [S1, cl.2.2(a)]
- New homestay construction → expressly contemplated, but local land/building approvals remain separate → This appears to fit the published route, subject to the remaining checks if approved locally.
- Existing running homestay under previous scheme → transition/legacy-benefit wording exists, but complete certificate-transition treatment is not specified → Confirm this in writing with the authority.
- Hotel/resort/motel/guest house/boarding or lodging house → Consider another accommodation category; it does not fit the current homestay scheme.
- Is the property in a protected/environmentally sensitive area?
- Valmiki/Bhimbandh/forest/ESZ, or close to nationally protected monuments → tourism eligibility does not override those restrictions → Confirm this in writing with the authority before acquisition or construction.
- No overlay identified → continue with ordinary local approvals. Use these branches as a starting test and confirm the result for the exact property.
05 / Applicant and operating structures
Set the ownership and operating structure
| Structure | Supported route | Principal obstacle | Source | Question requiring clarification |
|---|---|---|---|---|
| Resident individual owner | Strongest published fit if address, title and room requirements are satisfied | Must still satisfy local land/building/fire/food/tax rules | S1 cls.2.1–2.6 | None on residence; property-specific approvals remain |
| Joint/inherited ownership | Possible with written NOC from all co-owners | Defective/incomplete succession/title or missing co-owner consent | S1 cl.2.2(f) | Whether mutation/probate/heirship documents beyond title/NOC will be demanded in portal |
| Owner living elsewhere | Explicitly supported; owner need not reside | Operating-control and staff arrangements must still meet obligations | S1 cl.2.1(a) | Whether any minimum on-site responsible person is administratively required |
| Owner using caretaker | Caretaker can practically assist operations; scheme contemplates employees | Scheme does not make caretaker eligible registration holder | S1 cls.2.6.8, 2.5 | Whether a named caretaker must be declared or police-verified |
| Long-term lessee | ≥10-year valid lease expressly contemplated | Lease duration/title/encumbrance and authority to alter/use property | S1 cl.2.2(e) | Must lease be registered? S2 says “Registered Sale Deed / Lease Deed” but does not expressly say every lease must be registered; obtain written answer |
| Company | NOT EXPRESSLY ESTABLISHED as registration holder | Aadhaar/individual identity structure; no corporate applicant clause | S1 cl.2.2(c); S2 | May a company hold registration? If yes, whose Aadhaar/bank account is used? |
| Partnership firm | NOT EXPRESSLY ESTABLISHED | Same | S1/S2 | Can firm be registration holder or only operator? |
| LLP | NOT EXPRESSLY ESTABLISHED | Same | S1/S2 | Can LLP be applicant/registration holder/beneficiary? |
| Trust/society | NOT EXPRESSLY ESTABLISHED | Same | S1/S2 | Is institutional ownership compatible with “owner/lessee” eligibility? |
| Professional operator/management company | Commercial service contract is not prohibited in located text, but regulatory split is unconfirmed | No clause says holder and operator may differ | S1 cl.2.6.8 | Can operator control bookings, employees, food and guest register while certificate remains with owner? |
| Capital-only participant, no property selected | No registration route yet | Scheme eligibility attaches to property/address and tenure | S1 cls.2.1(e)–(f), 2.2(e) | Select eligible address and legal applicant first |
| Landowner proposing new construction | New construction expressly contemplated | Land use, building plan, protected-area and deadline issues | S1 cl.2.2(a); S17–S21 | Resolve 12/18/24-month PRC conflict before relying on construction schedule |
| Running legacy homestay | S1 acknowledges prior-scheme registrations/benefits | Legacy certificate transition and renewal mapping not fully specified | S1 resolution p.2 | Does existing 2024 registration remain valid until expiry, migrate automatically, or need re-registration? |
06 / Property and classification standards
Prepare the property for inspection
| Topic | Mandatory / classification / guidance / unclear | Requirement | Applies when | Source | Confidence |
|---|---|---|---|---|---|
| Location | Mandatory | Within 5 km of listed tourism place | All scheme homestays | S1 cl.2.1(e)–(f), pp.2–3 | HIGH |
| Total rooms | Mandatory definition | Maximum 8 rooms in accommodation unit | All | S1 cl.2.1(a), p.2 | HIGH |
| Minimum rooms | Unclear | Not stated in the material reviewed | All | — | LOW |
| Beds/guest capacity | Unclear | Not stated in the material reviewed | All | — | LOW |
| Subsidised rooms | Funding condition | Assistance for maximum 4 rooms; remaining rooms up to 8 at own cost | Incentive applicant | S1 cl.2.2(b), p.4 | HIGH |
| Guest-room size | Mandatory standard | Minimum 120 sq ft | Guest rooms | S1 p.8 / facility clause | HIGH |
| Bathroom | Mandatory standard | Attached sanitary bathroom; minimum 30 sq ft | Guest room | S1 p.8 | HIGH |
| Toilet | Mandatory standard | Western commode/WC | Guest bathroom | S1 p.8 | HIGH |
| Bathroom water | Mandatory standard | 24-hour water supply | Guest bathroom | S1 p.8 | HIGH |
| Hot water | Mandatory standard | Good water-heating facility | Guest bathroom | S1 p.8 | HIGH |
| Toiletries | Mandatory standard | Appropriate toiletries | Guest bathroom | S1 p.8 | HIGH |
| Kitchen | Mandatory operating standard | Clean and safe kitchen within premises | Operating unit | S1 cl.2.5.2, p.7 | HIGH |
| Drinking water | Mandatory | Clean drinking water available 24 hours | Operating unit | S1 p.7 | HIGH |
| Electricity | Mandatory | Uninterrupted electricity | Operating unit | S1 p.7 | HIGH |
| Backup power | Unclear | No specified generator/inverter capacity located | All | S1 only requires uninterrupted electricity | MEDIUM |
| Fan | Mandatory | Ceiling fan in guest room | Guest rooms | S1 p.8 | HIGH |
| Heating/cooling | Mandatory standard | AC with heating/cooling function | Guest rooms | S1 p.8 | HIGH |
| Wiring/sockets | Mandatory safety/facility standard | Adequate sockets/switches and proper wiring | Guest rooms/property | S1 p.8 | HIGH |
| Storage | Mandatory standard | Cupboard/wardrobe and hangers | Guest room | S1 p.8 | HIGH |
| In-room beverage basics | Mandatory wording appears in checklist | Water/tea-coffee-related provision including cups/glasses and packets | Guest rooms | S1 p.8; translation should be checked against Hindi checklist | MEDIUM |
| Common area | Unclear | No minimum common/living-area size located | All | — | LOW |
| Dining | Application evidence | Dining-area photograph requested if existing | Application | S1 p.11; S2 lines 118–130 | HIGH |
| Reception | Unclear | No separate reception desk requirement located | All | — | LOW |
| Access | Application evidence | Route map from main road required | Application | S1 p.11; S2 line 120 | HIGH |
| Parking | Desirable | Sufficient parking for maximum guests without disturbing surroundings | Where feasible | S1 p.9 | HIGH as guidance; not mandatory |
| Signage | Unclear | General property signage rule Not stated in the material reviewed; emergency-contact display required | Operating | S1 p.7 | MEDIUM |
| Internet/Wi-Fi | Desirable | Free/paid Wi-Fi/internet suggested | Optional facility | S1 p.9 | HIGH as guidance |
| Laundry | Desirable | Laundry at reasonable rate | Optional | S1 p.9 | HIGH as guidance |
| Accessibility | Desirable in S1 | Facilities for guests with disabilities listed as desirable | Optional classification/guidance in scheme | S1 p.9 | HIGH regarding S1 status |
| Telephone | Desirable | Room extension telephone | Optional | S1 p.9 | HIGH |
| Tourist information | Desirable | Local tourist information | Optional | S1 p.9 | HIGH |
| Games/library | Desirable | Indoor/outdoor games/library | Optional | S1 p.9 | HIGH |
| Fire safety | Mandatory general standard | Measures against fire risk | All | S1 p.7 | HIGH |
| Theft/security | Mandatory general standard | Measures against theft | All | S1 p.7 | HIGH |
| Electrical safety | Mandatory general standard | Measures against electrical accidents | All | S1 p.7 | HIGH |
| Structural safety | Mandatory general standard | Safety against structural accidents; building should meet building standards | All | S1 pp.7–8 | HIGH as tourism standard; local engineering proof unclear |
| Wildlife safety | Mandatory where relevant | Measures against wild animals among listed risks | Relevant properties | S1 p.7 | HIGH |
| Emergency numbers | Mandatory | Emergency contact numbers displayed | All | S1 p.7 | HIGH |
| First aid | Mandatory | First-aid kit and nearby hospital/doctor contact information | All | S1 p.8 | HIGH |
| Pest control | Mandatory | Regular pest control and records | All | S1 p.8 | HIGH |
| Waste management | Partly unclear | General cleanliness/sanitation obligations; detailed waste-segregation/disposal specification Not stated in the material reviewed in S1 | All | S1 standards | MEDIUM |
| Grade/classification bands | Not located | No Gold/Silver/Diamond or similar grades located | All | S1 | HIGH that none was found |
| Separate classification checklist score | Not located | No scoring system located | All | S1 | LOW/absence finding |
The 120 sq ft room and 30 sq ft bathroom standards, utilities and safety requirements appear in the controlling checklist/standards.
07 / Documents and declarations
Assemble the application file
| Document | Who provides/signs | Format/stamp requirement | Validity period | When required | Source | Unresolved issue |
|---|---|---|---|---|---|---|
| Online application form | Applicant | Portal form | Application-specific | Initial application | S1 cl.2.6; S2 lines 114–130 | Authenticated fields not inspected |
| Property ownership proof | Owner/applicant | S2 states Registered Sale Deed / ownership proof | Current title | Application | S1 p.11; S2 line 118 | Whether updated mutation/jamabandi also required portal-side is Not stated in the material reviewed |
| Lease deed | Lessee/applicant | Valid lease; S1 requires ≥10 years | At least 10 years under scheme rule | Application | S1 cl.2.2(e); S2 line118 | Whether remaining lease term must be 10 years on application date and registration requirement for lease should be confirmed |
| Co-owner NOC | All co-owners | Written NOC | Current for application | Joint ownership | S1 cl.2.2(f) | Portal template Not stated in the material reviewed |
| Route map | Applicant | Map showing approach from main road | Current | Application | S1 p.11; S2 line120 | Scale/GIS/file format Not stated in the material reviewed |
| Front photograph | Applicant | Digital photograph | Current | Existing property application | S1 p.11; S2 line121 | Resolution/file size Not stated in the material reviewed |
| Interior photographs | Applicant | Digital | Current | Existing property | S1/S2 | Same |
| All guest-room photographs | Applicant | Digital | Current | Existing property | S1/S2 | Same |
| Dining-area photograph | Applicant | Digital | Current | Existing property | S1/S2 | Same |
| Other-facility photographs | Applicant | Digital | Current | Existing property | S1/S2 | Same |
| Proposed design/layout | Applicant/design professional as applicable | Copy/soft copy | Current proposal | Proposed/new project in lieu of completed-property photos | S1 p.11; S2 line121 | Scheme does not state that this substitutes for statutory sanctioned building plans |
| Aadhaar | Applicant | Copy/upload | Current | Application | S1 cl.2.2(c), p.11; S2 | Corporate-applicant problem unresolved |
| PAN | Applicant | Copy/upload | Current | Application | S1 cl.2.2(c); S2 | Same |
| Passport-size photograph | Applicant | Digital/upload | Current | Application | S1/S2 | File standard Not stated in the material reviewed |
| Cancelled cheque | Applicant | Aadhaar-linked bank account | Current account | Application | S1/S2 | Corporate bank-account route unresolved |
| Self-declaration on clear title/dispute | Applicant | Form/statement per scheme | At application | Application | S1 cl.2.2(e) | Exact portal wording not inspected |
| Annual operational self-declaration | Registration holder | Online declaration | Annual | On/before 30 April each year | S1 operating clause p.6 | Portal form fields not inspected |
| ₹1,000 stamp-paper affidavit | Incentive beneficiary | Affidavit on ₹1,000 stamp paper | Scheme commitment period | Incentive/recovery undertaking | S1 p.20 | Exact execution/notarisation requirement beyond stamp value Not stated in the material reviewed |
| Guest government photo ID | Guest; retained by operator | Valid government photo ID copy | Stay-specific | Check-in/records | S1 cl.2.5.1 | Data-protection retention period for domestic ID copies not specified |
| Passport | Foreign guest | Passport mandatory under S1 | Valid | Foreign guest check-in | S1 cl.2.5.1 | Central Rule 17/Form III also applies |
| Form III foreigner report | Keeper of accommodation | Electronic through designated portal/app | Arrival/departure-specific | Within 24h of arrival and departure | S10 r.17 | Bihar scheme still says Form C/local police |
| Character certificate | — | — | — | Not stated in the material reviewed | — | Do not invent |
| Applicant police verification | — | — | — | Not stated in the material reviewed as a general application requirement | — | Local authority may separately require something; no current tourism source located |
| Staff police verification | — | — | — | Not stated in the material reviewed | — | Authority clarification advisable |
| Fire NOC | Building owner/operator if separately applicable | Fire portal process | Property-specific | Separate approval | S18 | Not listed as blanket S1 upload |
| Occupancy/completion certificate | Owner if applicable under building law | Local-authority document | Property-specific | Separate approval | S19 | Not listed as blanket homestay upload; legal need depends on building/address |
| FSSAI registration/licence | Food Business Operator | FoSCoS | Perpetual from 2026 unless suspended/cancelled/surrendered | If food activity constitutes regulated food business | S12–S14 | Correct KOB depends on actual operation |
08 / Application and inspection process
Follow the application and inspection process
| Step | Responsible person / authority | Input/document | Resulting record | Stated period | What does not happen automatically |
|---|---|---|---|---|---|
| 1. Address eligibility check | Applicant | Exact address/coordinates against 34 destinations and 5-km rule | Internal eligibility file | None | Proximity to a tourism site does not itself create eligibility |
| 2. Tenure/applicant check | Applicant | Ownership/≥10-year lease, co-owner NOC, PAN/Aadhaar/bank account | Applicant file | None | Management agreement does not replace qualifying tenure |
| 3. Local development check | Owner/architect/local authorities | Land-use/building/fire/protected-area facts | Separate permissions as applicable | Separate statutes | Tourism application does not regularise land/building use |
| 4. Portal account/application | Applicant | Portal credentials; online form | Application record | Portal timing not separately stated | Account creation is not approval |
| 5. Upload supporting documents | Applicant | Title/lease, route map, photographs/design, Aadhaar, PAN, photo, cheque, other prescribed documents | Submission package | At application | Upload does not prove correctness |
| 6. Pay application fee | Applicant | ₹2,000 | Payment record | At application | Fee is non-refundable and does not guarantee acceptance |
| 7. Homestay Cell scrutiny | Homestay Cell | Application package | Scrutiny/referral | No separate fixed period located | Incomplete application may be queried |
| 8. District/regional committee scrutiny/inspection | Regional Homestay Committee | Application + physical property/project | Inspection report | Report to be sent within 30 days of receipt of application | Inspection does not itself grant registration |
| 9. Clarification opportunity | Applicant / committee | Missing/defective information | Clarification record | Specific response period for ordinary document query Not stated in the material reviewed | Failure can result in rejection with reasons |
| 10. PRC decision | Competent tourism authorities | Committee recommendation | Provisional Registration Certificate for selected applicant | Embedded in overall process | PRC is not final registration or subsidy disbursement |
| 11. Construction/upgradation | PRC holder | Approved project/design + separate statutory permissions | Completed unit | CONFLICT: 12m + max 6m extension versus 24m for new project | PRC does not waive building approvals |
| 12. Extension request if needed | PRC holder → RHC/Director | Reason/request, possible physical verification | Extension decision | Max extension 6 months under cl.2.6.6(c) | Extension is discretionary; Director's decision required |
| 13. COD/final readiness | Applicant/authority | Completed property; appropriate inspection and relevant-rule compliance | Commercial Operation Date | No distinct inspection window beyond overall process located | Completion does not automatically create COD |
| 14. Departmental committee review | Departmental committee | RHC report | Recommendation to Director | 15 days after receipt of RHC report | Recommendation is not final approval |
| 15. Director decision | Director, Tourism | Complete record/recommendations | Approval/rejection / registration | Scheme says registration process within 60 days of application receipt | 60 days is not a deemed-approval clause |
| 16. Certificate through portal | Tourism Department/portal | Approved record | Registration certificate | After approval | Certificate download does not grant land/fire/food/tax approvals |
| 17. Incentive application | Beneficiary | Registered project, expenditure/approved-design evidence, affidavit etc. | Separate sanction/disbursement record | As per scheme stages | Registration does not automatically sanction money |
| 18. Appeal | Applicant | Online appeal against Director's decision | Decision of Secretary/Principal Secretary/ACS | Appeal period Not stated in the material reviewed | Appeal is not automatic reversal |
Authority structure. The Regional Homestay Committee includes a senior sub-divisional/district-designated tourism officer as chair, tourism-information/Directorate nominee, engineering nominee, tour-operator/travel-agent representative, Bihar Hotel Association representative, and a JEEViKA district project manager as special invitee; quorum is three. [S1, Annexure pp.14–16] The Tourism Department/Directorate may also inspect without prior notice. [S1, Annexure p.16]
09 / Fees, timelines, validity and renewal
Confirm fees, timing and certificate validity
| Item | Verified amount/time | Nature | Source | Qualification |
|---|---|---|---|---|
| Initial homestay application fee | ₹2,000 | Mandatory application fee | S1 cls.2.6.2–2.6.5 | Online; scheme contemplated DD to Director while portal unavailable |
| Refund | Non-refundable | Express condition | S1 p.12 | No refund even merely because approval does not follow |
| Renewal fee | ₹1,000 | Mandatory renewal fee | S1 cl.2.6.7 | Exact pre-expiry filing window Not stated in the material reviewed |
| Classification fee | Not stated in the material reviewed | — | — | Do not invent |
| Inspection fee | Not stated in the material reviewed | — | — | Do not invent |
| PRC construction period — cl.2.6.6(b) | 12 months | Published deadline | S1 p.12 | Conflicts with cl.2.6.6(f) for new projects |
| Maximum extension under cl.2.6.6(c) | 6 months | Discretionary extension ceiling | S1 pp.12–13 | Director decides; may involve verification |
| New-project period — cl.2.6.6(f) | 24 months | Published deadline | S1 p.13 | The official sources are not aligned with preceding 12+6 framework |
| Existing/upgradation period — cl.2.6.6(f) | 12 months | Published deadline | S1 p.13 | More consistent with preceding clause |
| RHC inspection/report | 30 days from receipt of application | Administrative process period | S1 p.16 | Not a guaranteed registration |
| Departmental committee | 15 days after RHC report receipt | Administrative process period | S1 p.16 | Not final decision |
| Registration process | Within 60 days from receipt of application | Scheme process period | S1 p.16 | No deemed-approval clause located |
| Registration validity | 5 years from COD | Certificate validity | S1 cl.2.6.7 | COD is defined by scheme |
| Annual self-declaration | By/on 30 April each year | Post-registration duty | S1 p.6 | Form not publicly inspected |
| DTO monitoring | Once every six months | Monitoring frequency | S1 p.14 | Geotagged photos/report to be uploaded |
| Response to show-cause before penalty/cancellation | 30 days | Procedural opportunity | S1 p.5 | Hearing opportunity also stated |
| Maximum scheme fine | ₹10,000 | Penalty ceiling under scheme | S1 p.5 | Does not replace penalties under other laws |
| Incentive operation commitment | 5 years from COD | Funding condition | S1 p.5 / recovery clauses | Early closure can trigger recovery |
Legacy certificates
S1 repeals the 2024 resolution but contains legacy-benefit language. It does not clearly state whether every 2024 certificate:
- continues unchanged to its original expiry;
- automatically migrates;
- must be re-registered under 2026; or
- uses a different renewal process. Legacy-certificate transition: Not stated in the material reviewed IN SUFFICIENT DETAIL.
10 / Operating duties after registration
Run the registered homestay correctly
Certificate, standards and monitoring
The unit must remain compliant with government orders, directions, SOPs and scheme standards. The Department may verify/inspect it, including without advance notice. A District Tourism Officer is to monitor every registered unit once every six months and upload geotagged photographs/report. [S1, pp.5–6, 14–16] An annual operational/standards self-declaration is due by/on 30 April. False or misleading information may result in cancellation/recovery proceedings. [S1, p.6]
Guest records
For each booking/guest, S1 requires records including:
- name;
- address/mobile;
- identification number;
- arrival date/time;
- departure date/time;
- city/place arrived from;
- next/departure city/place; and
- signature. A valid government photo ID is required; a passport is mandatory for a foreign citizen. Copies are to be kept securely, guest data is to remain confidential and access is limited to authorised personnel. [S1, cls.2.5.1, pp.6–7] A specific domestic guest-register retention period is Not stated in the material reviewed in S1.
Foreign guests
Current central law requires the keeper of an accommodation, expressly including a home stay, to:
- record prescribed particulars and signature;
- maintain those particulars electronically for at least one year;
- transmit completed Form III electronically to the Registration Officer within 24 hours of arrival; and
- transmit departure information electronically within 24 hours of departure. [S10, r.17(1), (5), (6), (7)(a); Form III] S1's reference to Form C/local police should therefore not be used as a substitute for current Rule 17. Whether Bihar wants an additional local-police step is unresolved.
Tourism statistics
S1 requires monthly totals of domestic and foreign tourists to be supplied to the Directorate of Tourism. [S1, p.7] The submission format, deadline day within the following month and portal field layout are Not stated in the material reviewed.
Safety and upkeep
The operator must maintain the mandatory room/bathroom standards, electricity, water, kitchen cleanliness, pest-control records, first aid, emergency contacts and safety measures described in Section 8. [S1, pp.7–9]
Rate display and billing
- mandatory tariff/rate-display rule: Not stated in the material reviewed IN CURRENT HOMESTAY SOURCES;
- prescribed invoice format: Not stated in the material reviewed;
- mandatory guest complaint register: Not stated in the material reviewed;
- portal complaint facility: contemplated by S1. [S1, p.10] Tax invoices remain subject to applicable tax law independently.
Staff/caretaker
The scheme places business responsibility on the owner and refers to employees, but:
- minimum staffing: Not stated in the material reviewed;
- caretaker requirement: Not stated in the material reviewed;
- police verification of staff/caretaker: Not stated in the material reviewed;
- local-employment quota: Not stated in the material reviewed. The Department may provide training to owners/staff; training support is not the same as a mandatory local-hiring condition. [S1, pp.13, 17–18]
Food
S1 expects a clean/safe kitchen and promotes local food, but it does not waive FSSAI requirements. Where food preparation/supply constitutes a food business, the actual FBO must determine the appropriate FoSCoS registration/licence route. From 01 April 2026, FSSAI's general turnover categorisation is registration up to ₹1.5 crore, State licence above ₹1.5 crore and up to ₹50 crore, and Central licence above ₹50 crore, subject to activity-specific criteria. FSSAI registrations/licences now have perpetual validity unless suspended, cancelled or surrendered. [S12 paras 3–5; S13 Q2–Q4; S14]
Insurance
No mandatory homestay-insurance policy or minimum cover was located in S1. Practical business recommendation, not a published requirement: property, public-liability, employee/workmen, fire and business-interruption cover should be assessed according to ownership, staffing, food service and guest exposure.
11 / Adjacent approvals and dependencies
Close the approvals outside Tourism
| Topic | What tourism registration resolves | What it does not resolve | Likely authority | Official source located | Property-specific question |
|---|---|---|---|---|---|
| Land title | Confirms Tourism Department's evidence requirement | Does not cure defective title, succession or encumbrance | Revenue/registration authorities/courts | S1, S17 | Is title/mutation/possession legally clear? |
| Agricultural land conversion | Nothing | Does not authorise non-agricultural use | SDO / Revenue & Land Reforms | Yes — S17 | Is conversion required for this khasra/plot and proposed use? |
| Zoning/land use | Nothing beyond tourism eligibility | Does not change planning designation | Municipality/planning authority | Yes — S19 framework | Is lodging/homestay use permitted at this address? |
| Building plan | S1 requires building-standard conformity | Does not sanction construction/alteration | Local authority/planning authority | Yes — S19 | Is original plan sanctioned; is revised sanction required? |
| Completion/occupancy | Nothing | Does not issue occupancy/completion certificate | Local authority | S19 | What certificate is required for this building/use? |
| Older construction | Nothing specific | Does not regularise unauthorised construction | Local authority | S19 | Can existing structure lawfully be occupied/altered? |
| Fire | Requires general fire safety | Does not automatically issue Fire NOC | Bihar Fire Service | Yes — S18 | Does size/height/occupancy trigger NOC or audit? |
| Food | Requires kitchen hygiene under tourism scheme | Does not register/licence FBO | FSSAI/State Food Safety | Yes — S12–S14 | Who is FBO and what KOB applies? |
| Police/domestic guest records | Requires guest records | No general applicant/staff police-clearance rule located | Local police if separately applicable | Partial | Does district police impose any separately notified lodging requirement? |
| Foreign guests | S1 records obligation generally | Does not replace Immigration Rules/Form III | Registration Officer/FRRO/BOI | Yes — S10–S11 | Is any additional Bihar/local-police report required beyond Form III? |
| GST | Nothing | Does not decide GST registration, rate, invoicing, OTA treatment or ITC | GST authorities | Yes — S15, S23–S24 | Who supplies accommodation to whom and through which platform/entity? |
| Udyam | Nothing | Does not create homestay eligibility | Ministry of MSME | Yes — S16 | Is MSME registration commercially useful/applicable? |
| Shops & Establishments/employer registration | Nothing | Does not register employer/business under separate labour/local laws | Labour/local authority | Partial — S22 portal | Does staffing/establishment structure trigger registration? |
| Electricity | Requires uninterrupted supply | Does not settle tariff category, load sanction or commercial conversion | DISCOM | Homestay-specific source Not stated in the material reviewed | Is existing sanctioned load/tariff lawful for use? |
| Water | Requires 24h clean/drinking water | Does not grant connection/extraction permission | Local body/water authority/groundwater authority as applicable | Homestay-specific source Not stated in the material reviewed | What source will be used and is permission needed? |
| Waste/sewage | Requires hygienic operation generally | Does not approve septic/sewer/solid-waste arrangement | Local body/PCB as applicable | Homestay-specific source Not stated in the material reviewed | Is current disposal system lawful for guest load? |
| Pollution-control consent | Nothing | Does not establish CTE/CTO exemption or requirement | BSPCB | Homestay-specific determination Not stated in the material reviewed | Does any ancillary activity trigger consent? |
| Property tax | Nothing | Does not determine residential/commercial assessment | Municipality/local body | Homestay-specific source Not stated in the material reviewed | Does operational use change assessment? |
| Valmiki/Bhimbandh ESZ | Nothing | Does not override ESZ/forest/wildlife restrictions | MoEFCC/Forest/Wildlife authorities | Yes — S20 | Is plot inside ESZ/protected/forest boundary and what activity is permissible? |
| Nationally protected monuments | Nothing | Does not override AMASR restrictions | ASI/National Monuments Authority/competent authority | Yes — S21 | Exact distance from protected boundary; is construction/renovation permitted? |
| Riverfront/flood constraints | Nothing | Does not grant floodplain/riverfront permission | Local/planning/water-resource authorities | Specific homestay rule Not stated in the material reviewed | Is parcel within a regulated flood/river zone? |
| Cantonment | No specific provision located | Tourism registration cannot override cantonment land/building law | Cantonment/Defence authority if applicable | Bihar homestay-specific rule Not stated in the material reviewed | Is property within such jurisdiction? |
Heritage warning
Several listed Bihar destinations are archaeological or monumental sites. Under the central AMASR Act, the standard statutory framework creates a 100-m prohibited area from the protected boundary and a further 200-m regulated area, subject to the Act's qualifications and any specific notification. Construction/renovation questions in those areas require the competent heritage process. [S21, ss.20A–20D] Because Bihar's tourism eligibility radius is 5 km, being eligible for the homestay scheme can coexist with being too close to a protected monument for proposed construction. The two tests are independent.
12 / Incentives, subsidy and funding
Evaluate incentives without assuming sanction
14.1 Mukhyamantri Homestay Protsahan Yojana 2026 — financial assistance
Scheme: Mukhyamantri Homestay Protsahan Yojana 2026. Authority: Bihar Tourism Department. Source: S1 cl.4.1. Eligible property/location The homestay must satisfy the current scheme, including the 34-destination/5-km restriction and registration requirements. Eligible project types S1 expressly includes:
- new proposed homestays;
- upgradation of existing homestays; and
- establishment/upgradation/construction of homestay rooms in an existing house. [S1, cl.2.2(a)] Eligible room base Assistance is limited to four rooms, even though a homestay may contain up to eight rooms. [S1, cl.2.2(b)] Verified assistance
- up to ₹2.5 lakh per eligible room; or
- actual expenditure according to the approved design,
- whichever is lower;
- maximum four assisted rooms;
- ordinary maximum ₹10 lakh. [S1, cl.4.1, p.16] This is therefore not a blanket “₹10 lakh subsidy”: actual approved eligible expenditure can produce a lower amount.
14.2 Additional assistance
For the categories specified in S1:
- women;
- Self-Help Groups; and
- youth entrepreneurs aged 18–25 years at the time of application, an additional ₹25,000 per eligible room is stated, with an overall stated ceiling of ₹11 lakh. [S1, p.17] Whether an SHG itself is the legal Tourism registration holder is not clearly explained and should not be inferred merely from this incentive clause.
14.3 Disbursement
The verified staged structure is:
| Stage | Share |
|---|---|
| COD / commencement of commercial operation | 50% |
| After one year | 25% |
| After two years | 25% |
[S1, cl.4.2, p.17] This means the headline sanctioned amount is not described as a single upfront construction grant.
14.4 Five-year operation/recovery condition
A beneficiary receiving financial assistance must keep the unit operating for at least five years from COD. Early closure/noncompliance can trigger recovery:
| Closure period after COD | Recoverable incentive |
|---|---|
| 0–12 months | 100% |
| 13–24 months | 80% |
| 25–36 months | 50% |
| 37–48 months | 25% |
| 49–60 months | 10% |
The scheme states 9% simple interest per annum in the recovery framework. Recovery can proceed under the Bihar & Orissa Public Demands Recovery Act, 1914. [S1, pp.18–19] The beneficiary gives an undertaking on ₹1,000 stamp paper concerning proper use of assistance and recovery for fraud/false documentation/noncompliance. [S1, p.20]
14.5 Non-financial support
S1 identifies possible support including:
- listing/promotion through Bihar Tourism's website/social channels;
- inclusion in promotional literature;
- encouraging tour operators/travel agents to include homestays;
- training for owners/staff. The Director may modify/add/withdraw non-financial incentives, and the State disclaims liability for losses from changes. [S1, cls.4.3 onward, pp.17–18]
14.6 Bank route and interest subsidy
A compulsory bank-loan route, interest-subsidy formula or bank-linked credit guarantee under the 2026 homestay scheme itself was Not stated in the material reviewed. The Aadhaar-linked bank account/cancelled cheque is required for the scheme, but that is not evidence of a bank loan requirement.
14.7 Broader Bihar Tourism Policy incentives
Bihar Tourism Policy 2023/2024 materials contain a separate eligible category for Rural Tourism Project/Tourist Village/Cultural Village/Farm Stay, with a minimum-project-cost framework. Ordinary homestay was not located in the relevant eligible-project list reviewed. [S6–S7] Therefore: DO NOT add Tourism Policy 2023 fiscal incentives to a 2026 homestay project unless the Tourism Department separately confirms the project qualifies under both regimes.
14.8 Availability/budget status
S1 states an indicative governmental expenditure of approximately ₹25 crore over five financial years for the scheme objective, but this is a budget/programme statement, not an individual entitlement. The scheme runs through the stated period to 2031 / FY 2030–31 unless amended, replaced or closed. [S1, resolution p.2; cl.2.3] Whether applications for every destination remained open with uncommitted budget on 05 September 2026 could not be confirmed from a public allocation dashboard. Assistance is separately scrutinised and sanctioned; it must not be treated as automatic.
13 / Business implications
Translate the rules into a workable project
Before selecting or acquiring a property
the project team should establish at minimum:
- exact geocoordinates;
- which of the 34 notified tourism places is relied upon;
- evidence that the site falls within the published 5-km radius;
- current title and encumbrance position;
- whether title is sole/joint/inherited;
- if leased, whether the lease satisfies the published ≥10-year requirement;
- local-body/planning jurisdiction;
- current recorded land use and whether conversion is required;
- protected monument, forest, wildlife and ESZ overlays;
- existing sanctioned building position;
- number of rooms in the entire accommodation unit; and
- identity of the proposed Tourism registration holder. A capital-only participant cannot solve the regulatory question before these property/applicant facts exist.
Before construction or renovation
A homestay PRC or scheme eligibility should not be treated as building permission. Before works begin, the project team should have the architect/local adviser identify:
- applicable amended Bihar Building Bye-Laws/local regulations;
- sanctioned-plan requirements;
- completion/occupancy requirements;
- land-conversion requirements;
- Fire NOC/audit position;
- heritage/ASI restrictions;
- ESZ/forest/wildlife restrictions;
- electrical load;
- water/sewage arrangement; and
- whether proposed 120-sq-ft rooms and 30-sq-ft attached bathrooms can be legally created. The unresolved 12-month + six-month extension versus 24-month new-project deadline should be answered in writing before a construction programme is promised.
Registration holder versus operating entity
The located scheme does not expressly establish that:
- an individual may hold registration while a company/LLP is the declared operator;
- an LLP/company can itself hold the registration;
- a professional management company can replace the registered owner/lessee for statutory duties; or
- a management agreement transfers scheme responsibility. The scheme expressly places responsibility for the business and the conduct of employees/guests on the owner in its liability provisions. [S1, cl.2.6.8] Accordingly, the project team should not represent a split owner/operator structure as regulator-approved until the Tourism Department answers that question.
What an LLP or management agreement cannot solve by itself
An LLP, company, revenue-share agreement, hotel-management agreement or operating contract cannot by itself cure:
- an ineligible address;
- a building with more than the permitted room count;
- defective title;
- a lease shorter than the scheme requires;
- absence of co-owner consent;
- prohibited land use;
- unauthorised construction;
- heritage/forest/ESZ restrictions;
- lack of applicable fire/food/tax approvals; or
- uncertainty about who legally holds the Tourism certificate.
Property assessment and commercial planning should include
- scheme-radius evidence;
- ownership/lease evidence;
- building-room inventory;
- room/bathroom dimensional survey;
- utility capacity;
- renovation/legalisation scope;
- local approval dependencies;
- project timing under both conflicting scheme clauses;
- likely qualifying versus non-qualifying subsidy expenditure;
- five-year incentive lock-in/recovery exposure;
- operator versus registration-holder structure;
- FSSAI responsibility if meals are served;
- foreign-guest reporting capability;
- monthly tourism-statistics process;
- annual 30-April declaration; and
- six-monthly inspection readiness.
Questions that must be answered before the project team proposes business terms
- Who will own the property?
- Who will be the qualifying lessee, if any?
- Who will hold the Tourism registration?
- Is that holder an individual or entity?
- Who will hold the bank account receiving incentives?
- Who will employ staff?
- Who will be the FBO?
- Who will issue guest invoices?
- Who will file Form III for foreign guests?
- Who will maintain guest records?
- Who bears subsidy-recovery liability?
- Who is responsible for local approvals?
- Can the professional manager's role be recorded with Tourism?
- What happens to registration if property is sold, inherited, leased to a new person or the management agreement terminates? No fixed equity percentage, capital contribution or revenue-share arrangement is supported by the regulatory sources and none is recommended here.
14 / Official-source conflicts
Resolve conflicting official instructions
Conflict 1 — construction deadline
Source A: S1, cl.2.6.6(b)–(c), Annexure p.12. Proposition A: PRC holder has a maximum 12 months to complete construction; a maximum six-month extension may be considered. Source B: S1, cl.2.6.6(f), Annexure p.13. Proposition B: a new proposed project must construct/start operations within 24 months; upgradation/existing homestay gets 12 months. Both provisions are in the same 18 June 2026 instrument. Neither expressly says that cl.2.6.6(f) overrides cl.2.6.6(b), and 12 months + maximum six-month extension produces 18 months, not 24. Status: `The official sources are not aligned`. Affected properties: new-build/proposed homestays requiring construction after PRC. Authority to resolve: Director, Tourism Department, preferably confirmed by Secretary/Principal Secretary if necessary.
Conflict 2 — “Homestay / BnB” terminology
Source A: S1, the controlling 2026 resolution/guidelines, establishes the category as Homestay and repeals the earlier 2024 resolution. It does not separately define a current B&B category. Source B: S2, the current official English webpage, says residents may register homes as “Homestay / BnB units.” The implementation webpage may be using BnB colloquially or carrying forward older terminology, but it does not establish whether B&B is legally identical to the 2026 homestay category. Status: `The official sources are not aligned`. Affected properties: operators wishing to register, advertise or structure themselves specifically as “B&B” rather than homestay. Authority to resolve: Director, Tourism.
Conflict 3 — Bihar “Form C” wording versus current central Form III
Source A: S1 instructs foreign-tourist reporting to local police using the prescribed Form C. Source B: S10, Rule 17 of the Immigration and Foreigners Rules, 2025, requires electronic Form III, with the form itself labelled “[Earlier FORM ‘C’]”, within 24 hours of arrival and departure. It expressly includes homestays. The national-law portion is resolved by hierarchy/currentness: operators should comply with the current Rule 17/Form III duty. What is not resolved is whether Bihar intends an additional separate local-police copy/process. Status: current central obligation settled; additional Bihar step unresolved. Affected properties: any Bihar homestay accommodating foreigners/OCI cardholders within Rule 17. Authority to resolve: Registration Officer/FRRO or district SP/DCP as applicable, copied to Tourism Department.
Conflict 4 — GST accommodation-rate material
Source A: the CBIC services-rate webpage reviewed continues to surface 12% for hotel accommodation valued at or below ₹7,500 per unit/day. [S23] Source B: Ministry of Finance/PIB FAQ dated 16 September 2025 says such hotel accommodation “shall have to charge” 5% without ITC following the 56th GST Council changes. [S24, Q6–Q7] A GST Council recommendation or PIB FAQ is not a substitute for tracing the operative rate notification, and that implementing services-rate notification was not located in this research pass. Status: `The official sources are not aligned FOR PURPOSES OF THIS guide`. Practical effect: this guide does not publish a settled current accommodation GST rate. Authority/source required to resolve: current CBIC rate notification/amending notification and transaction-specific tax review.
Conflict checked and resolved — FSSAI turnover thresholds
Older official FSSAI material may still surface legacy ₹12-lakh registration wording. S12 dated 13 March 2026 expressly states that its new thresholds supersede all earlier orders and regulations concerning turnover thresholds/criteria and applies from 01 April 2026. Therefore this is not an unresolved conflict: use S12/S13.
16 / Source register
Official source register
| ID | Issuing body | Document or portal | Document/order number | Published | Effective | Language | Status/currentness | Official URL | Pages/sections reviewed | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| S1 | Government of Bihar, Tourism Department | *Mukhyamantri Homestay Protsahan Yojana 2026* / guidelines | TDRT/80010/02-2024-1277 | 18 Jun 2026 | 18 Jun 2026 | Hindi | PRIMARY — current controlling instrument located | Official PDF | Complete 23-page PDF, resolution pp.1–2 and Annexure pp.1–20 | Official filename: CM HomeStay Scheme 2026.pdf. Repeals Resolution 3644 dated 06.08.2024. Gazette copy separately Not stated in the material reviewed. |
| S2 | Bihar Tourism | Mukhyamantri Homestay Protsahan Yojana 2026 webpage | N/A | Site last updated 03 Aug 2026 | Current webpage | English | IMPLEMENTATION | Official scheme webpage | Lines 104–133, 146–157 | Summarises documents and links to portal; uses “Homestay / BnB”. |
| S3 | Bihar Tourism | Bihar Tourism Services Portal | N/A | NOT STATED | Live on review date | Interface | PORTAL — partially inspectable | Tourism Services Portal | Public landing only | SPA; authenticated form not fully inspectable. No account/submission made. |
| S4 | Government of Bihar / Tourism | Cabinet Decisions entry approving 2026 scheme | Cabinet item 09 | 18 Jun 2026 page entry | N/A | Hindi | PRIMARY/IMPLEMENTATION corroboration | Cabinet decisions page | Item 09 | S1 records Cabinet approval at meeting dated 17 Jun 2026; web entry is dated 18 Jun 2026. |
| S5 | Government of Bihar | Bihar Digital Repository listing | Repository item for Mukhyamantri Homestay Protsahan Yojana 2026 | Current repository | N/A | Hindi | DISCOVERY/REPOSITORY | Bihar Digital Repository | Tourism Department listing | Corroborates official circular/order existence; not the Gazette copy. |
| S6 | Government of Bihar, Tourism Department | Bihar Tourism Policy 2023 — amended | Policy instrument | 2023/amended | Current policy context | English | PRIMARY — adjacent incentive framework | Bihar Tourism Policy 2023 Amended | Relevant eligible-project schedule, including farm stay | Ordinary homestay eligibility should not be inferred from this separate policy. |
| S7 | Government of Bihar, Tourism Department | Bihar Tourism Policy Guidelines 2024 — amended | Guidelines under Tourism Policy | 2024/amended | Current adjacent guidelines located | English | IMPLEMENTATION — adjacent incentive framework | Amended 2024 guidelines | Eligible-project list, indexed p.19 | Lists Rural Tourism/Tourist Village/Cultural Village/Farm Stay; ordinary homestay not located in that list. |
| S8 | Bihar Tourism | Critical Contacts | N/A | Site current; last updated 03 Aug 2026 | Current | English | CONTACT | Bihar Tourism critical contacts | Tourism helpline and TIC table | State helpline and selected tourist information centres. |
| S9 | Bihar Tourism | Recognised Hotels & Home Stay | N/A | Current webpage | Current listing | English | IMPLEMENTATION/DISCOVERY | Recognised Hotels & Home Stay | Current list | Shows recognised homestays among other accommodation; does not define new-registration requirements. |
| S10 | Ministry of Home Affairs, Government of India | *Immigration and Foreigners Rules, 2025* | G.S.R. 596(E) | 01 Sep 2025 | 01 Sep 2025 | Hindi & English Gazette | CENTRAL — current | MHA Gazette PDF | r.17, Gazette p.28; Form III, p.33 | Expressly includes “home stay”; Form III is “[Earlier FORM ‘C’]”. |
| S11 | Bureau of Immigration / FRRO | Form C/Form III accommodation portal | N/A | Current | Current | English | CENTRAL PORTAL | FRRO accommodation reporting portal | Public accommodation reporting/registration information | Current electronic reporting route. |
| S12 | FSSAI | Order implementing revised food-business turnover thresholds | F. No. RCD-01002/1/2021-Regulatory-FSSAI-Part(1) | 13 Mar 2026 | 01 Apr 2026 | English/Hindi | CENTRAL — current, expressly superseding earlier thresholds | FSSAI threshold order | paras 2–5 | Registration ≤₹1.5cr; State >₹1.5–50cr; Central >₹50cr. |
| S13 | FSSAI | FAQs on 2026 amendment | Same regulatory file series | 27 Mar 2026 | 01 Apr 2026 reforms | English/Hindi | CENTRAL IMPLEMENTATION | FSSAI 2026 FAQs | Annexure Q1–Q4 and related | Confirms perpetual validity and no routine renewal. |
| S14 | FSSAI / FoSCoS | Revised Kind of Business Eligibility | Updated 01 Apr 2026 | 01 Apr 2026 | 01 Apr 2026 | English | CENTRAL PORTAL GUIDANCE | FoSCoS Kind of Business PDF | Food Services, PDF pp.7–8 | Hotel, restaurant, boarding-house and other food-service categories; no distinct “Bihar homestay” KOB located. |
| S15 | CBIC / Government of India | CGST Act / GST registration material | CGST Act s.22; Notification 65/2017-CT as relevant | 2017 onwards | Current subject to amendments | English | CENTRAL — tax dependency | CBIC Section 22 source | s.22; e-commerce exemptions/limitations reviewed | Does not make Tourism registration a GST registration. Exact OTA/operator treatment requires transaction-specific review. |
| S16 | Ministry of MSME | Udyam Registration Portal | N/A | Current | Current | English/Hindi | CENTRAL PORTAL | Udyam official portal | Registration information | Free, paperless; not listed by S1 as a Tourism-registration prerequisite. |
| S17 | Government of Bihar, Revenue & Land Reforms | BiharBhumi Land Conversion FAQ | Bihar Agricultural Land (Conversion for Non-Agricultural Purposes) Act 2010 / Rules 2011 | Current FAQ | Act/rules as applicable | English/Hindi | PRIMARY/IMPLEMENTATION — property dependency | BiharBhumi land-conversion FAQ | FAQ on authority/process | SDO identified as competent authority; requirement is property/use-specific. |
| S18 | Bihar Fire Service | Fire Service and Fire NOC/Audit Portal | N/A | Current | Current | English/Hindi | PRIMARY PORTAL — property dependency | Bihar Fire Service / Fire NOC & Audit Portal | NOC/audit functions | S1 does not list a blanket Fire NOC document; applicability remains building-specific. |
| S19 | Government of Bihar / PMAA / UD&HD | Bihar Building Bye-Laws current download/amendment page | Original Notification 578, 08 Dec 2014; later amendment instruments including 2022 and Notification 10713/2025 | Current page updated 05 Aug 2026 | As amended | Hindi/English | PRIMARY/IMPLEMENTATION — current amendment trail | PMAA Building Bye-Laws page | Current amendment index; 2014, 2022, 2025 documents | Detailed building approval must use applicable amended text/local planning authority, not S1 alone. |
| S20 | MoEFCC, Government of India | Eco-Sensitive Zone notifications index | Various | Current index | As notified/amended | English/Hindi | CENTRAL — protected-location dependency | MoEFCC ESZ notifications | Bihar entries including Bhimbandh and Valmiki | Relevant because both destinations occur in S1. |
| S21 | Archaeological Survey of India | Ancient Monuments and Archaeological Sites and Remains Act, 1958 | Act 24 of 1958, as amended | 1958/as amended | Current | English | CENTRAL — heritage dependency | ASI official Act PDF | ss.20A–20D, PDF pp.11–13 | 100-m prohibited area and following 200-m regulated area around nationally protected monuments, subject to statutory qualifications/notifications. |
| S22 | Government of Bihar | ServicePlus Bihar | N/A | Current | Current | English/Hindi | PORTAL — adjacent business services | Bihar ServicePlus | Shops & Establishments and tourism-related service listings | Does not by itself establish Shops & Establishments applicability to every homestay. |
| S23 | CBIC | GST Goods and Services Rates webpage | Notification framework under Heading 9963 | Current page | Unclear whether page reflects all 2025 rate changes | English/Hindi | CENTRAL — currentness issue | Heading 9963 | Page still surfaces 12% for accommodation ≤₹7,500. | |
| S24 | Ministry of Finance / PIB | FAQ-2 on 56th GST Council decisions | PIB release | 16 Sep 2025 | Describes changes intended from 22 Sep 2025 | English | CENTRAL GUIDANCE — not substituted for rate notification | Q6–Q9 | Says ≤₹7,500 hotel accommodation is 5% without ITC. Implementing notification was not traced in this review. |
Review and corrections
Keep the guide current.
Sources were checked on . Recheck the live application route before filing because portals and implementation instructions can change.
Send a correction with the relevant official source. Browse all states and Union territories.