Before you choose the property
Start with the rules that actually shape the project.
The final 2026 Guidelines are effective 01 September 2026.
A new homestay requires a Tourism Trade Permit before commencement of operations, valid for three years.
Trade Licence, GSTIN and Land Diversion Certificate are explicit Part A requirements.
Scope: Source-checked regulatory and business-planning guidance. It does not approve a particular title, building, tax position, food activity or operating structure.
01 / Executive finding
The practical starting point
- The current controlling tourism instrument located is the Lakshadweep Tourist Trade Guidelines, 2026, issued by the Department of Tourism under F.No. 20/01/2026-TD, notice dated 19 August 2026, effective 01 September 2026. Existing hotels, resorts, homestays and specified tourist-trade establishments operating before commencement are required to comply and obtain the requisite permit by 30 September 2026. [S1, notice p.1; Guidelines §II(i)–(ii)]
- A new homestay must obtain a Tourism Trade Permit before commencing operations. The Guidelines say the permit is issued by the “Competent Authority as notified by the Department of Tourism”; the separate notification identifying that Competent Authority was Not stated in the current official material reviewed. [S1, Guidelines §II(iii)–(iv)]
- The Tourism Trade Permit is expressly valid for three years from issue. The current Guidelines also give the Competent Authority a cancellation power after giving the permit holder an opportunity, where the Guidelines are violated. Renewal procedure, renewal window and renewal fee are Not stated in the current official material reviewed. [S1, Guidelines §II(v)–(vi)]
- The current instrument does not define “homestay.” It does not state an owner/family-residence requirement, native/permanent-resident condition, minimum or maximum guest rooms, bed limit, maximum guest capacity, or whether the entire building may be let. Consequently, older “tourist home” concepts cannot safely be imported into the 2026 category. [S1, pp.1–2; S3; S4]
- Every hotel/resort/homestay under Part A of the final 2026 Guidelines must obtain a Trade License, GSTIN and Land Diversion Certificate. The facility “should possess” a commercial electricity connection; that wording is weaker than the surrounding “mandatory” provisions and should be clarified in writing before publication as an absolute legal prerequisite. [S1, Guidelines Part A(i)–(iv), p.1]
- If food is served, the Guidelines say an “FSSAI License” is mandatory. Current central FSSAI rules distinguish Registration from State/Central Licences, including Registration up to ₹1.5 crore turnover from 01 April 2026. Whether the Tourism Department accepts FSSAI Registration for a small homestay is therefore an unresolved official-source wording issue. [S1, Part A(v); S15, Annexure Q2]
- Environmental operating conditions are unusually important: mandatory segregated waste bins and Panchayat handover, an STP or other suitable liquid-waste-management system of sufficient capacity, no development in a No Development Zone, and mandatory rainwater harvesting “as may be prescribed.” [S1, Part A(vi)–(ix), pp.1–2]
- Applicant eligibility is a major unresolved issue. The 2026 tourism instrument does not say whether the Tourism Trade Permit may be held by a company, LLP, partnership, trust, society, lessee, professional operator or caretaker. Current public ServicePlus workflows for Land Diversion, Building Permit and Trade Licence identify the applicant as an Individual, but those auxiliary portals cannot be treated as proof of Tourism Trade Permit eligibility. [S7–S9]
- A public Tourism Trade Permit application portal, application form, fee schedule, inspection checklist, processing target and certificate-download workflow were Not stated in the current official material reviewed. The current Lakshadweep Tourism Service page publicly lists only tour-package and guest-house-booking services. [S5]
- Lakshadweep is a single district with island-level subdivisions and Village (Dweep) Panchayats. There are ten Village (Dweep) Panchayats, one for each inhabited island, and one District Panchayat. Property due diligence must therefore identify the exact island, local Panchayat/subdivision and coastal/IIMP zoning before acquisition or development. [S18]
- Non-native guests require a Lakshadweep entry permit under the 1967 Entry and Residence Rules. The current ePermit portal expressly states that tourist-category sponsorship and Police Clearance Certificate uploads are no longer required. This is a guest-access regime, not a substitute for the homestay's Tourism Trade Permit. [S10–S11]
- For foreign guests, the central Immigration and Foreigners Rules, 2025 expressly include “home stay” within accommodation: guest particulars must be retained electronically for at least one year, and Form III arrival and departure information must be transmitted electronically within 24 hours of each event. [S13, Rule 17]
- Lakshadweep's 2026–27 25% Capital Investment Subsidy may be relevant only if the Industries Department accepts the proposed homestay as an eligible servicing unit. The scheme does not expressly name homestays; its 2026 application window ended 31 August 2026, and assistance is committee-verified and sanctioned rather than automatic. [S19, circular p.1; Guidelines §§4–9]
- There is not yet enough current primary-source material to publish a definitive owner-facing Lakshadweep homestay eligibility and registration guide. The current compliance obligations are publishable, but the definition, eligible registration holder, room/capacity rules, permit form, fees, inspection procedure, renewal and status of older tourist-home rules require written Tourism Department clarification. [S1–S5]
02 / Document chronology
Use the current rules and implementation
1967 — Entry and Residence Rules
The Laccadive, Minicoy and Amindivi Islands (Restriction on Entry and Residence) Rules, 1967 establish the separate permit regime for persons who are not natives of the islands. The current 2026 ePermit portal still expressly invokes these Rules. [S10–S11] This regime governs access to Lakshadweep; it does not constitute permission to operate tourist accommodation.
08 March 2019 — ICRZ Notification
MoEFCC issued the Island Coastal Regulation Zone Notification, 2019, S.O.1242(E), replacing the preceding island-protection framework subject to its plan-transition provisions and later amendments. Lakshadweep development remains dependent on the applicable IIMP/coastal zoning. [S14]
May 2020 — Draft Lakshadweep Tourism Policy
The Tourism Department published a draft Tourism Policy for public comments. It discussed local-resident “Tourist Homes,” island carrying capacity, proposed NOCs and room concepts. Those provisions were never established in the located official material as a final operative policy and must not be carried into 2026 requirements. [S3]
16 June 2020 — Home Stays consultation
The Department issued a public consultation asking residents about genuine “Home Stays” and included a basic reference questionnaire. Its own wording made it a discussion/consultation exercise. It is not a current registration form. [S4]
01 September 2025 — Immigration and Foreigners Rules, 2025
The new central Rules superseded earlier foreigner-registration rules subject to savings. Rule 17 now expressly covers home stays and creates electronic reporting and one-year record-retention duties. [S12]
11 April 2026 — Draft Tourist Trade Guidelines
F.No.20/01/2026-TD published a draft for thirty days of comments. The draft:
- separated Hotels/Resorts and Home Stays into Parts A and B;
- required Trade Licence and Land Diversion Certificate;
- used an STP-only liquid-waste formulation;
- did not contain the final GSTIN requirement; and
- did not contain the final rainwater-harvesting provision. [S2] The official “Documents” page still links this April draft under the same “Lakshadweep Tourist Trade Guidelines, 2026” title, creating a material stale-document risk.
13 July 2026 — Capital Investment Subsidy invitation
The Directorate of Industries invited applications for the 2026–27 25% Capital Investment Subsidy, requiring island-level scrutiny and a 31 August 2026 submission deadline. [S18]
19 August / 01 September 2026 — Final Tourist Trade Guidelines
The final instrument was issued on 19 August, effective 01 September. It:
- expressly includes Hotels / Resorts / Homestays together under Part A;
- adds mandatory GSTIN;
- allows STP or other suitable liquid-waste-management systems of sufficient capacity;
- adds mandatory rainwater harvesting “as may be prescribed”;
- provides a cancellation power after opportunity; and
- creates a 30 September transitional compliance deadline for existing establishments. [S1] This final August instrument controls over the April consultation draft. The April draft was not an operative earlier regulation requiring formal repeal.
Unresolved historical overlap
The 2020 draft policy stated that the Administration had already framed/notified guidelines for Tourist Homes. A current primary copy of those underlying Tourist Home guidelines, together with a rescission/supersession instrument or confirmation of continued applicability, was Not stated in the current official material reviewed. This is consequential because the final 2026 Guidelines regulate “Homestays” without defining the category.
03 / Category definitions
Choose the right accommodation category
| Category | Location | Eligible owner/applicant | Residence requirement | Operator allowed | Capacity | Food position | Source |
|---|---|---|---|---|---|---|---|
| Homestay | UT of Lakshadweep; development expressly prohibited in NDZ | Not stated in the current official material reviewed | Not stated in the current official material reviewed | Not stated in the current official material reviewed | Not stated in the current official material reviewed | FSSAI “License” required if food served | S1, Part A |
| Hotel | UT of Lakshadweep; no development in NDZ | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Same Part A food rule | S1 |
| Resort | UT of Lakshadweep; no development in NDZ | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Same Part A food rule | S1 |
| Tourist Home | Historical 2020 policy material discussed inhabited islands; current status unresolved | Historical draft referred to local residents; not publishable as current | Current rule Not stated in the material reviewed | Current rule Not stated in the material reviewed | Historical draft numbers are not current law | Current rule Not stated in the material reviewed | S3, Background source only |
| Bed & Breakfast | Not stated in the material reviewed as a separate current Lakshadweep category | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Current Lakshadweep sources reviewed |
| Guest House | Current Administration operates/bookable guest-house services, but a private-accommodation regulatory definition was not located | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | S5 |
| Farm stay | Not stated in the material reviewed as a current UT tourism category | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Current Lakshadweep sources reviewed |
| Serviced accommodation | Not stated in the material reviewed as a current UT tourism category | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Not stated in the material reviewed | Current Lakshadweep sources reviewed |
Publication consequence: national Ministry of Tourism classification concepts must not be substituted for the absent Lakshadweep definition. The 2026 UT permit regime is the controlling local source.
04 / Eligibility decision tree
Check whether the applicant and property qualify
Step 1 — Identify the exact property address and island/local body.
- No property/site selected yet → it is impossible to test NDZ/IIMP status, title, Land Diversion or building permissions. Not established in the published material
- Exact site is identified → obtain the currently applicable coastal/IIMP zoning for that parcel.
- Site is confirmed within a No Development Zone → current Tourism Guidelines prohibit development of the facility. does not appear to fit the published homestay definition
- Site is outside NDZ or an existing lawful structure is proposed → continue. Step 2 — Establish the property right.
- Applicant is registered owner with clear land records → continue.
- Joint/inherited/co-owned property → current homestay-specific co-owner-consent rules were not located. Confirm this in writing with the authority
- Long-term lease/rental arrangement → the Trade Licence workflow recognises lease/rental documents, but Tourism Trade Permit eligibility of a lessee is not established. Confirm this in writing with the authority
- No title, lease or legally documented occupation → property permitting cannot presently be established. Not established in the published material Step 3 — Identify the proposed Tourism Trade Permit holder.
- Individual owner → auxiliary public workflows accept individuals, but the 2026 tourism instrument itself does not prescribe applicant eligibility. Continue only after obtaining the current Tourism application instructions. Confirm this in writing with the authority
- Company / LLP / partnership / trust / society → no 2026 tourism provision located authorising or prohibiting such entity as permit holder. Confirm this in writing with the authority
- Professional management company → no provision located allowing it to substitute for the statutory permit holder. Confirm this in writing with the authority Step 4 — Establish who will reside at the property.
- Owner/family will reside there → the current Guidelines still provide no owner-residence rule or definition. Confirm this in writing with the authority
- Owner lives elsewhere and a caretaker/operator will remain on site → no current caretaker route was located. Confirm this in writing with the authority
- No resident host proposed → whether this remains a “homestay” or should fall into another accommodation category cannot be determined from S1. Consider another accommodation category Step 5 — Establish operating structure.
- Owner operates personally → continue subject to the missing homestay definition.
- Owner appoints a professional operator → no current rule establishes whether registration holder and operator may differ. Confirm this in writing with the authority
- Entire property is leased to an operator → Trade Licence documentation alone does not answer Tourism Trade Permit eligibility. Confirm this in writing with the authority Step 6 — Establish rooms, beds and guest capacity.
- Any proposed room count → current minimum/maximum room and bed limits are Not stated in the current official material reviewed. Historical draft numbers must not be used. Confirm this in writing with the authority Step 7 — Establish building status.
- New construction or substantial proposed construction → obtain address-specific coastal/IIMP clearance position, Land Diversion Certificate and applicable Building Permit before treating development as viable. Confirm this in writing with the authority
- Existing residential building proposed for conversion → Land Diversion is expressly mandatory under S1; building-use/occupancy consequences must also be checked. Confirm this in writing with the authority
- Already-running homestay → comply with final 2026 Guidelines and obtain requisite permit by 30 September 2026. Existing operation does not prove eligibility under the new regime. Confirm this in writing with the authority Important: because no operative homestay definition was located, this research cannot responsibly produce a branch ending This appears to fit the published route, subject to the remaining checks.
05 / Applicant and operating structures
Set the ownership and operating structure
| Structure | Supported route | Main obstacle | Source | Question requiring clarification |
|---|---|---|---|---|
| Resident individual owner | Individual can use current Land Diversion, Building Permit and Trade Licence public workflows; Tourism Permit still required | S1 does not say that residence or individual ownership establishes homestay eligibility | S1, S7–S9 | Is an individual owner the required/standard Tourism Trade Permit holder, and must that owner reside on site? |
| Joint/inherited ownership | Establish title/possession first | Homestay-specific co-owner consent, succession and representative-applicant rules not located | S7; S1 | Does Tourism require all co-owners' consent/NOC? |
| Owner living elsewhere | Property approvals may still be pursued by the relevant lawful applicant | No owner-residence or absentee-owner rule located | S1 | Can a homestay remain registered if owner/family do not reside there? |
| Owner using caretaker | No express prohibition located | Caretaker cannot be assumed to satisfy any resident-host requirement that may exist outside the published Guidelines | S1 | Is resident caretaker operation permissible, and whose name appears on permit? |
| Long-term lessee | Trade Licence service can recognise lease/rental/legal-occupation documents | Tourism Permit eligibility of lessee not established; Land Diversion and Building Permit public applicant descriptions say Individual | S7–S9 | May a lessee obtain the Tourism Trade Permit, and what owner NOC/title documents are required? |
| Company | GST/Udyam frameworks can recognise companies, but that proves nothing about tourism eligibility | S1 is silent; current property-service workflows publicly describe individual applicants | S1, S7–S9, S19 | Can a company be permit holder or only manager/contracting entity? |
| Partnership firm / LLP | Udyam recognizes relevant entity forms for MSME purposes | No tourism-authorisation provision located | S1, S19 | Are partnership firms or LLPs valid Tourism Trade Permit holders? |
| Professional operator / management company | Operational services can be contractually structured only around a valid statutory holder | Management agreement does not confer tourism eligibility | S1 | May registration holder and day-to-day operator differ? What notice/approval is required? |
| Capital-only participant, no property | Conduct island/site search and regulatory diligence first | Cannot apply for address-specific land/building/tourism approvals without a site and defined applicant | S1, S7–S9, S14 | Which property/applicant structure must be established before investment commitments? |
| Landowner proposing construction | Resolve NDZ/IIMP, diversion and building approval before development; Tourism Permit before operation | Tourism definition/capacity rules remain missing, creating design risk | S1, S7, S8, S14 | What room/capacity/design standards must be frozen before architecture begins? |
| Running homestay | Transitional route under S1 | Compliance and permit must be regularised by 30 Sep 2026; legacy status is not grandfathered in the located text | S1, notice + §II(ii) | What application package and inspection process applies to existing operators? |
06 / Property and classification standards
Prepare the property for inspection
| Topic | Mandatory / classification / guidance / unclear | Requirement | Applies when | Source | Confidence |
|---|---|---|---|---|---|
| Tourism Trade Permit | Mandatory | Obtain before a new homestay commences operations | All new homestays | S1 §II(iii) | HIGH |
| Existing establishment transition | Mandatory | Comply and obtain permit by 30 Sep 2026 | Operating before commencement | S1 notice; §II(ii) | HIGH |
| Trade Licence | Mandatory | Must obtain Trade Licence | All Part A establishments | S1 Part A(i) | HIGH |
| GSTIN | Mandatory tourism condition | Must obtain GSTIN number | All Part A establishments | S1 Part A(ii) | HIGH |
| Land Diversion Certificate | Mandatory | Must obtain certificate | All Part A establishments | S1 Part A(iii) | HIGH |
| Commercial electricity | Unclear wording | Facility “should possess” commercial electricity connection | Part A facilities | S1 Part A(iv) | MEDIUM |
| Food permission | Mandatory if food served | S1 says FSSAI Licence | Food-serving establishments | S1 Part A(v); S15 | MEDIUM because of Registration/Licence terminology conflict |
| Waste segregation | Mandatory | Separate biodegradable/non-biodegradable bins | All Part A facilities | S1 Part A(vi) | HIGH |
| Waste handover | Mandatory | Waste handed to Panchayat door-to-door collection | All Part A facilities | S1 Part A(vi) | HIGH |
| Liquid waste | Mandatory | STP or other suitable system of sufficient capacity | All Part A facilities | S1 Part A(vii) | HIGH for obligation; LOW for design criteria |
| NDZ | Mandatory prohibition | No facility developed in No Development Zone | Development | S1 Part A(viii) | HIGH |
| Rainwater harvesting | Mandatory, specification unresolved | Mandatory facility “as may be prescribed” | All Part A facilities | S1 Part A(ix) | HIGH for principle; LOW for technical specification |
| Minimum rooms | Unclear | Not stated in the current official material reviewed | — | S1 review | LOW |
| Maximum rooms | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Maximum beds/guests | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Total building rooms vs guest rooms | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Bedroom dimensions | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Attached/private bathroom | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Toilet dimensions/fixtures | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Kitchen standard | Unclear | No tourism specification located; FSSAI applies if food business | Food service | S1/S15 | LOW |
| Common/living/dining area | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Access road/path | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Parking | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Reception/front desk | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Signage | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Hot water | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Electricity backup | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Cooling/heating | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Internet | Unclear | Not stated in the material reviewed | — | S1 review | LOW |
| Fire equipment | Adjacent/unclear | Not stated by S1; Fire Safety Certificate appears in a dynamic Trade Licence enclosure set, trigger unclear | Depending on Trade Licence workflow/property | S9 | LOW |
| Structural-safety certificate | Unclear | Not stated in the material reviewed as homestay requirement | — | S1 | LOW |
| Guest-safety equipment | Unclear for accommodation | Detailed safety rules exist for water sports, not carried over to homestays | If separately running watersports | S1 Part B | HIGH distinction |
| Accessibility | Unclear | Not stated in the material reviewed | — | S1 | LOW |
| Homestay grades/classification | Unclear | No Gold/Diamond/other current classification schedule located | — | S1–S4 | LOW |
| Insurance | Unclear for homestay | No homestay insurance mandate located; group insurance is expressly imposed on watersports centres only | Homestay alone | S1 p.2 | HIGH distinction |
07 / Documents and declarations
Assemble the application file
| Document | Who provides/signs | Format/stamp requirement | Validity period | When required | Source | Unresolved issue |
|---|---|---|---|---|---|---|
| Tourism Trade Permit application | Applicant | Not stated in the material reviewed | — | Before operation | S1 | Form and eligible signatory not published in located sources |
| Trade Licence | Relevant Revenue applicant | ServicePlus workflow | Licence validity Not stated in the material reviewed in sources reviewed | Part A prerequisite | S1; S9 | Exact sequencing with Tourism Permit requires clarification |
| GSTIN proof | Registrant | GST registration record | Subject to GST law | Tourism prerequisite | S1 Part A(ii) | Whether any special UT upload format is required not located |
| Land Diversion Certificate | Public portal says Individual applicant | Online/kiosk; no attestation for listed uploads | Not stated in the material reviewed | Mandatory under S1 | S7 | Corporate/lessee route not established |
| ID proof for Land Diversion | Applicant | Valid ID proof | Current | Land Diversion application | S7 | Tourism-specific ID list not located |
| Site plan showing diverted patch and measurements | Applicant/professional as required | Portal upload | Project-specific | Land Diversion | S7 | Technical drawing format/file limit not publicly established in evidence reviewed |
| Ownership / possession / mutation / RoR / land-register extract / Patta | Property holder | Portal upload | Current title evidence | Land Diversion | S7 | Which document is sufficient in a particular title chain is property-specific |
| Building ownership certificate | Property owner | Portal enclosure | Current | Building Permit | S8 | — |
| Building/site/service plans | Appropriate owner/professional | Portal enclosure | Project-specific | Building Permit | S8 | Detailed drawing standards not extracted from a current homestay rule |
| Building Permit fee receipt | Applicant | Receipt | Application-specific | Building Permit | S8 | Amount Not stated in the material reviewed in source reviewed |
| Legal occupation/lease/rental documentation | Trade Licence applicant | Portal enclosure set | Current | Depending on Trade Licence workflow | S9 | Does not establish Tourism Trade Permit eligibility |
| Owner consent for hired building | Owner | Listed dynamically in Trade Licence service | Not stated in the material reviewed | Conditional trade-licence case | S9 | Whether required in every rental case needs workflow confirmation |
| Environmental Clearance Certificate | Relevant authority | Appears in dynamic Trade Licence enclosure list | Property/project-specific | Conditional | S9 | Trigger not clear from public descriptor |
| Fire Safety Certificate | Fire authority | Appears in dynamic Trade Licence enclosure list | Not stated in the material reviewed | Conditional | S9 | Not established as universal homestay requirement |
| FSSAI Registration/Licence | Food Business Operator | FoSCoS | Perpetual unless suspended/cancelled/surrendered under current rules | Food service | S1, S15 | S1 says “License”; small FBO may qualify for Registration |
| Commercial electricity proof | Consumer | Not stated in the material reviewed as Tourism upload | Account-dependent | S1 condition | S1 | Whether bill/connection certificate must be uploaded |
| STP/liquid-waste documentation | Owner/operator | Not stated in the material reviewed | — | Inspection/compliance | S1 | Approved design/capacity certification not published |
| Rainwater-harvesting proof | Owner/operator | Not stated in the material reviewed | — | Compliance | S1 | Prescribed technical specification not located |
| Photos of property/rooms | Applicant | Not stated in the material reviewed | — | — | Current tourism sources | No current photo/file requirements located |
| Floor plans for Tourism application | Applicant/professional | Not stated in the material reviewed | — | — | Current tourism sources | Building Permit plans exist separately |
| Location/map/GPS file | Applicant | Not stated in the material reviewed for Tourism Permit | — | — | Current tourism sources | Site plan required for Land Diversion |
| Affidavit | Applicant | Not stated in the material reviewed for Tourism Permit | — | — | Current tourism sources | — |
| Stamp-paper declaration | Applicant | Not stated in the material reviewed for Tourism Permit | — | — | Current tourism sources | Separate subsidy requires ₹100 non-judicial bond; not tourism registration |
| Character certificate | Applicant | Not stated in the material reviewed | — | — | Current tourism sources | — |
| Applicant police verification/PCC | Applicant | Not stated in the material reviewed for homestay registration | — | — | S1 | Tourist ePermit expressly no longer requires tourist PCC |
| Panchayat NOC | Local body | Not stated in the material reviewed as universal 2026 Tourism Permit document | — | — | S1 | Historical draft references cannot be imported |
| Co-owner NOC | Co-owners | Not stated in the material reviewed | — | — | S1 | Must be clarified for joint title |
Download the Lakshadweep property and application checklist ↓
08 / Application and inspection process
Follow the application and inspection process
Because no public Tourism Trade Permit form or authenticated workflow was located, the following sequence distinguishes verified prerequisites from unresolved Tourism implementation steps.
| Step | Responsible person / authority | Input | Resulting record | Stated time | What does not happen automatically |
|---|---|---|---|---|---|
| 1. Fix exact island/site | Owner/investor; Revenue; Environment/Science & Technology; Panchayat | Parcel details, title and applicable coastal/IIMP map | Site due-diligence position | Not stated in the material reviewed | Identification of land does not establish tourism eligibility |
| 2. Establish lawful occupation/title | Owner/lessee | Title, possession, mutation, lease etc. | Property-right file | Property-specific | A lease does not automatically authorise lessee as Tourism Permit holder |
| 3. Land Diversion | Applicant through Revenue/ServicePlus | ID, measured site plan, title/possession records | Land Diversion Certificate/report | 7 days excluding holidays shown by portal | Seven days is a service metric, not guaranteed approval. |
| 4. Building Permit if construction/regulated building work is proposed | Owner/applicant; LPWD | ownership certificate, Land Diversion, site/building/service plans, fee receipt | Building Permit | 7 days excluding holidays shown by portal | Permit does not itself create a Tourism Trade Permit. |
| 5. Trade Licence | Public Revenue workflow | applicant ID and applicable occupation/conditional enclosures | Trade Licence | 1 week excluding holidays shown by current descriptor | Trade Licence does not substitute for Tourism Permit. |
| 6. Obtain GSTIN | Applicant / GST authorities | GST registration application | GSTIN | Tax-law workflow | GSTIN does not establish property/tourism approval |
| 7. Obtain food registration/licence if serving food | FBO / FSSAI-FoSCoS | Food-business application | FSSAI Registration or Licence | FSSAI process | Tourism must clarify whether “Registration” satisfies S1 wording |
| 8. Prepare environmental/utility compliance | Property owner/operator | commercial power, waste segregation, liquid-waste system, RWH; site outside NDZ | Supporting compliance evidence | Not stated in the material reviewed | Installation does not guarantee Tourism approval |
| 9. Obtain current Tourism Trade Permit application package | Proposed holder / Director Tourism | Current form, fee, applicant eligibility and document list NOT PUBLICLY LOCATED | Application | Not stated in the material reviewed | No public online account/form was located |
| 10. Pay Tourism fee, if any | Applicant | Fee/payment route Not stated in the material reviewed | Receipt | Not stated in the material reviewed | Payment, if required, would not guarantee approval |
| 11. Tourism inspection | Competent Authority/inspection team | Checklist Not stated in the material reviewed | Inspection report/query | Not stated in the material reviewed | Inspection cannot be assumed to result in approval |
| 12. Queries/deficiency correction | Applicant and authority | Corrected documents | Query response | Not stated in the material reviewed | No deemed approval provision located |
| 13. Approval or refusal | Competent Authority | Complete compliant case | Tourism Trade Permit/refusal | Not stated in the material reviewed | S1 only says permission is issued after compliance; it sets no guaranteed processing period |
| 14. Appeal | Authority/procedure Not stated in the material reviewed | — | — | — | No Tourism appeal mechanism was located |
| 15. Operational compliance | Permit holder/operator | Permit + continuing licences/compliances | Operating records | Continuous | Tourism Permit does not replace guest-entry or foreigner reporting rules |
| 16. Renewal | Permit holder | Not stated in the material reviewed | Renewal/next permit | Three-year permit validity only | Renewal is not shown as automatic |
Existing homestays
An establishment operating before 01 September 2026 is not exempt: S1 expressly requires compliance and the requisite permit by 30 September 2026. [S1, notice and §II(ii)]
09 / Fees, timelines, validity and renewal
Confirm fees, timing and certificate validity
| Item | Verified amount/period | Character | Source | Qualification |
|---|---|---|---|---|
| Tourism Trade Permit application fee | Not stated in the current official material reviewed | — | S1/S5 | Do not estimate |
| Tourism classification fee | Not stated in the material reviewed | — | Current sources | No current classification scheme located |
| Tourism inspection fee | Not stated in the material reviewed | — | Current sources | — |
| Tourism processing period | Not stated in the material reviewed | — | Current sources | No statutory or administrative target located |
| Tourism Permit validity | 3 years from date of issuance | Express current rule | S1 §II(v) | Does not guarantee renewal |
| Existing operator compliance date | 30 Sep 2026 | Transitional mandatory deadline | S1 | Applies to listed establishments operating before commencement |
| Renewal fee | Not stated in the material reviewed | — | Current sources | — |
| Renewal window | Not stated in the material reviewed | — | Current sources | — |
| Land Diversion service period | 7 days excluding government holidays | Portal service metric | S7 | Not guaranteed approval |
| Building Permit service period | 7 days excluding government holidays | Portal service metric | S8 | Not guaranteed approval |
| Trade Licence service period | 1 week excluding government holidays | Portal service metric | S9 | Dynamic implementation page should be checked before filing |
| Lakshadweep guest ePermit application fee | ₹50 per applicant | Guest-access fee, not homestay fee | S10 | Heritage fee separate |
| Guest ePermit heritage fee | ₹100 age 12–18; ₹200 above 18 | Guest-access fee | S10 | Not a tourism-establishment fee |
| Successfully submitted ePermit fees | Non-refundable | ePermit refund rule | S10 | Failed/excess transactions addressed separately |
| FSSAI Registration/Licence validity | Perpetual unless suspended, cancelled or surrendered | Central current rule | S15 | Continuing compliance still mandatory |
Legacy certificates: no current provision was located explaining conversion, renewal or grandfathering of pre-2026 Tourist Home/homestay certificates. The only located transitional rule is the obligation to obtain the current permit by 30 September 2026.
10 / Operating duties after registration
Run the registered homestay correctly
Duties expressly established by current tourism sources
A registered homestay must continue to satisfy the Part A framework on which its permit rests:
- maintain the requisite Trade Licence;
- maintain GSTIN status required by the tourism rule;
- have the required Land Diversion Certificate;
- address the commercial-electricity condition;
- maintain applicable FSSAI compliance if food is served;
- segregate biodegradable and non-biodegradable waste;
- hand waste to the Panchayat during door-to-door collection;
- maintain an STP or other suitable liquid-waste system of sufficient capacity;
- comply with the NDZ prohibition; and
- maintain mandatory rainwater harvesting as prescribed. [S1, Part A] Violation can lead to cancellation after an opportunity is given. [S1 §II(vi)]
Guest entry
A person who is not a native of Lakshadweep is subject to the Entry and Residence Rules and current ePermit process. The live portal states that tourist-category sponsorship and PCC upload are no longer required. [S10–S11]
Foreign guests
For every foreigner, including an OCI cardholder, the accommodation keeper must:
- obtain and record the prescribed arrival/departure particulars;
- obtain the guest's signature;
- keep those particulars electronically for at least one year;
- make them available for authorised inspection;
- submit Form III electronically within 24 hours of arrival; and
- transmit departure details within 24 hours of departure. Rule 17 expressly includes “home stay.” [S12, Rule 17(1)–(7)]
Items not located as homestay operating rules
The following were Not stated in the current official material reviewed:
- mandatory tariff/rate display;
- prescribed guest invoice format;
- Tourism Department complaint register;
- Tourism Permit certificate-display rule;
- domestic guest-register format;
- domestic guest ID-copy retention period;
- monthly tourism-statistics return;
- occupancy return;
- ordinary staff police verification;
- caretaker police verification;
- mandatory local-employment percentage;
- mandatory employee training;
- prescribed incident report;
- homestay-specific insurance;
- Tourism Department record-retention period; and
- renewal reminder/window. These must not be added to a public Lakshadweep guide without a current official source.
11 / Adjacent approvals and dependencies
Close the approvals outside Tourism
| Topic | What tourism registration resolves | What it does not resolve | Likely authority | Official source located | Property-specific question |
|---|---|---|---|---|---|
| Land use/diversion | Confirms Tourism expects Land Diversion Certificate | Does not issue the certificate or validate title | Revenue Department | S1, S7 | Is commercial/tourism diversion permissible on this parcel? |
| Building permission | Nothing expressly | Does not approve new construction, structural alteration or plans | LPWD | S8 | Is a Building Permit required for the proposed work and is the existing building regular? |
| Completion/occupancy status | Nothing located | Tourism rule does not establish completion/occupancy legality | LPWD/local authorities | Specific current homestay source Not stated in the material reviewed | What completion/occupancy evidence is required for this building? |
| Coastal/IIMP/NDZ | Prohibits tourism facility development in NDZ | Does not map the parcel or confer environmental permission | Environment/Science & Technology/LCZMA/MoEFCC | S1, S14 | Which current IIMP zone contains the parcel, and what activity is permissible? |
| Fire | Nothing expressly in S1 | Does not provide fire approval | Fire authority/Chief Fire Officer | Conditional Trade Licence field located in S9 | Does this building type/height/capacity require fire NOC? |
| Food | Requires FSSAI compliance if food is served | Does not issue food registration/licence | FSSAI / designated Food Safety authority | S15 | Is FSSAI Registration sufficient for this homestay under Tourism Part A(v)? |
| Police | Nothing for ordinary domestic accommodation registration located | Does not replace law-and-order/entry requirements | Lakshadweep Police / District Administration | S10–S12 | Are any additional local guest/staff registers prescribed? |
| Foreign guests | Nothing | Does not replace Rule 17/Form III | MHA/Bureau of Immigration/Registration Officer | S12–S13 | Has the property completed accommodator registration before accepting foreigners? |
| Guest entry permit | Nothing | Does not authorise non-native guests to enter Lakshadweep | Collectorate/ePermit authority | S10–S11 | Does each proposed guest hold the correct island/date permit? |
| GST | S1 requires GSTIN as a Tourism prerequisite | Does not determine tax liability/rate/return obligations | GST authorities / tax adviser | S16 | What registrations, invoicing and return obligations follow from the actual operating structure? |
| Udyam | Nothing | Tourism Permit does not create MSME registration | Ministry of MSME | S19 | Is Udyam commercially useful/required by a chosen incentive? |
| Trade Licence | S1 requires it | Tourism Permit does not issue/renew it | Revenue Department | S9 | Which conditional enclosure set applies to this activity/site? |
| Electricity | S1 states facility “should possess” commercial connection | Does not provide/load-sanction a connection | Lakshadweep Electricity Department | S1; current directory | What tariff/load/conversion applies to this site? |
| Water | Rainwater harvesting obligation located | No generic potable-water entitlement or connection standard established | Relevant UT/local utility | Specific rule Not stated in the material reviewed | Is adequate potable water available and what permissions apply? |
| Waste | Requires segregation/Panchayat handover and liquid-waste system | Does not approve engineering design | Panchayat / Environment | S1 | Is the proposed STP/alternative system acceptable for this site and guest capacity? |
| Property tax/local tax | Nothing | No concession or classification determined by Tourism Permit | Dweep Panchayat/relevant tax authority | Current homestay-specific provision Not stated in the material reviewed | Does commercial lodging alter local tax classification? |
| Heritage/protected area | Nothing | Tourism Permit does not override protected-site controls | Relevant environment/cultural authority | Specific property rule Not stated in the material reviewed | Is the parcel within any separately protected/notified area? |
| Insurance | No homestay requirement located | Tourism Permit does not establish adequate liability/property coverage | Insurer/operator | No homestay mandate located | What risk coverage is commercially appropriate? |
12 / Incentives, subsidy and funding
Evaluate incentives without assuming sanction
14.1 Lakshadweep 25% Capital Investment Subsidy — 2026–27
Official scheme: Revised Guideline for Providing 25% Capital Investment Subsidy to Micro and Small Entrepreneurs Units, circulated for 2026–27 under F.No. 7/2/2026-IND/374, dated 13 July 2026. [S18] Area: the enclosed guideline states all inhabited islands in Lakshadweep. [S18, §3] Activity scope: the guideline defines an industrial unit broadly as a micro/small manufacturing or servicing unit, excluding UT Administration units. New units must fall outside the negative list. [S18, §§4–5] Homestay applicability: NOT CONFIRMED. “Homestay,” hotel or tourist accommodation was not expressly identified in the provisions reviewed. A project should therefore obtain written Industries confirmation that the proposed activity qualifies as an eligible servicing unit before putting any subsidy into a financial model. Eligible applicant: the financial-assistance section says any individual above 18 years, including women, ex-servicemen and persons with disability. Another provision permits qualifying societies and SHGs. However, the scheme introduction describes its purpose as assistance to local entrepreneurs, while the 2026 circular invites “eligible entrepreneurs functioning in the U.T. of Lakshadweep.” These formulations are not sufficiently aligned to assume non-resident investor eligibility. [S18, §§1, 5 and 8] Investment ceiling: the guideline states that the micro enterprise/unit's investment in plant, machinery and building must be below ₹25 lakh for eligibility under this scheme. [S18 §8(ii)] Assistance: 25% of total cost of the enterprise inclusive of land, machinery and construction, limited to ₹6.25 lakh. [S18 §8(iii)] Eligible fixed-capital concepts: building/built-up area and plant/machinery are addressed. Plant/machinery calculation includes eligible equipment/tools and stated transportation/erection costs subject to the guideline; second-hand machinery is excluded from the 25% subsidy calculation. [S18 §4] Expansion: investment in expansion, modernisation and diversification is stated as not eligible. [S18 §4(c)] Double benefit: the guideline excludes an entrepreneur who has enjoyed another subsidy for the same purpose from identified institutions. [S18 §5(ii)] Required route and evidence for the 2026–27 invitation:
- submit through concerned DC/BDO;
- Island Level Committee recommendation/authentication;
- PWD Assistant Engineer certification of estimated building/built-up cost;
- physical inspection of installed machinery;
- original purchase bills;
- ownership/possession certificate; and
- Udyam registration before release of assistance. [S18, circular p.1] The enclosed guideline provides for Island Level Committee verification/physical inspection, followed by District Level Scrutinising Committee review and recommendation of subsidy quantum. [S18 §§7–9] Bank route: no mandatory commercial-bank loan route for this particular UT subsidy was established in the provisions reviewed. The route located is departmental through island/DC/BDO and Industries committees. Application timing: the 2026–27 circular required applications by 31 August 2026 at 6:00 PM. The reviewed application window was therefore closed on the research date. No extension was located. [S18, circular p.1] Automatic entitlement? No. The circular expressly calls applications for “considering for sanction”; island and district-level verification/recommendation are built into the process. The ₹6.25 lakh ceiling must not be represented as automatically available.
14.2 Udyam
Udyam registration is not a Tourism Trade Permit requirement in S1. It is relevant because the current 2026 capital-subsidy circular requires Udyam before release. The official portal states that Udyam registration is free, paperless, self-declared and requires no renewal. [S19]
14.3 Other homestay-specific incentives
A currently open Lakshadweep Tourism Department subsidy, interest subsidy, homestay-specific capital reimbursement or automatic tourism loan programme was Not stated in the current official material reviewed. Generic national MSME or credit schemes should not be described as Lakshadweep homestay incentives until the relevant implementing authority and lender confirm activity eligibility.
13 / Business implications
Translate the rules into a workable project
Before selecting or acquiring a property
the project team should establish, for the specific candidate property:
- exact island, parcel and Village (Dweep) Panchayat/subdivision;
- current coastal/IIMP zone and confirmation that the proposed facility is not in NDZ;
- title, mutation/possession and any co-owner issues;
- whether acquisition/lease structure is compatible with the required statutory applicant;
- whether Land Diversion is available;
- whether the existing/proposed building can lawfully be used as intended;
- commercial electricity feasibility;
- liquid-waste and solid-waste feasibility;
- food-service intention; and
- who the Tourism Department will accept as Tourism Trade Permit holder. A capital-only participant should not move from broad island screening to binding property economics until those matters are materially resolved.
Before construction or renovation
The architecture brief should not be frozen from historical Lakshadweep “Tourist Home” room numbers. No current homestay room/bathroom/capacity schedule has been located. Before construction expenditure:
- resolve NDZ/IIMP position;
- obtain the required Land Diversion route;
- obtain applicable Building Permit;
- obtain written Tourism confirmation of the intended accommodation category and capacity;
- design an acceptable liquid-waste system;
- incorporate rainwater harvesting;
- test commercial power requirements; and
- resolve food-preparation design with FSSAI requirements where applicable.
Registration holder versus operating entity
The located 2026 Guidelines do not establish that registration holder and professional operator may be different persons. Therefore a structure in which:
- owner holds title;
- an LLP/company supplies capital;
- another company operates; and
- a caretaker resides at the property cannot be treated as compliant merely because contractual documents allocate those roles. The Tourism Department must first confirm who can legally hold the permit and what relationship, if any, an authorised manager may have to that holder.
LLP or management agreement
An LLP agreement, lease, power of attorney or hotel-management agreement may allocate private contractual rights, but it cannot by itself:
- create Tourism Trade Permit eligibility;
- cure incompatible land use;
- replace Land Diversion;
- replace Building Permit;
- remove IIMP/NDZ restrictions;
- create an exemption from Trade Licence/GSTIN/FSSAI requirements; or
- override guest-entry/foreign-reporting law.
Property-development scope
Property-development scope should be conditional on local permissions rather than sold as a fixed package. A site outside NDZ may still carry other IIMP, building, infrastructure or environmental restrictions.
Property-assessment and commercial-planning file
Each candidate property should include at minimum:
- island/subdivision/Panchayat;
- parcel/title status;
- applicable IIMP/coastal zone;
- land-diversion status;
- existing building approvals;
- proposed physical works;
- proposed guest-room/bed count clearly marked pending Tourism confirmation;
- power/water/waste systems;
- food-service model;
- proposed statutory permit holder;
- proposed manager/operator;
- guest entry-permit logistics;
- foreigner-reporting readiness;
- verified permit/fee assumptions only; and
- incentives modelled at zero unless separately sanctioned.
Questions to answer before business terms
the project team should know before proposing economic terms:
- who owns the land/building;
- whether title is sole or shared;
- who is intended to hold statutory registrations;
- whether that person/entity is eligible;
- who will live on site;
- who will manage guests;
- whether a company/LLP may operate while another person holds the permit;
- intended food operation;
- building stage;
- proposed room/bed capacity;
- exact environmental zone;
- status of Trade Licence/Land Diversion/Building Permit;
- whether the project is new or existing; and
- whether any subsidy assumption has an actual sanction rather than merely theoretical eligibility. No fixed ownership percentage, capital contribution or income commitment follows from the regulatory evidence.
14 / Official-source conflicts
Resolve conflicting official instructions
Conflict 1 — Official Lakshadweep website exposes both draft and final 2026 Guidelines
Source A: official “Documents” page dated 11 April 2026 links 17759345784551.pdf. That PDF expressly says it is a draft published for comments/suggestions. [S2] Source B: official Tourism notice published 19 August 2026 links the final instrument, says the Guidelines “have been issued,” and fixes 01 September 2026 as commencement. [S1] Contradictory practical propositions: the April draft lacks final requirements including GSTIN and rainwater harvesting and structures accommodation categories differently. Hierarchy/date resolution: Source A expressly identifies itself as a consultation draft; Source B is a later final notice with an effective date. The August instrument therefore controls. Affected properties: every hotel, resort and homestay. Practical instruction: do not link the April “Documents” page as the operative rule in a public guide without clearly labelling it obsolete.
Conflict 2 — Current “homestay” category versus older “Tourist Home” material
Source A: final 2026 Guidelines regulate “Homestays” but provide no definition, room limit, host-residence condition or applicant qualification. [S1] Source B: the 2020 draft policy discussed local-resident “Tourist Homes,” capacity concepts and stated that separate Tourist Home guidelines had previously been framed/notified. [S3] The underlying primary Tourist Home notification and its current rescission/survival status were Not stated in the current official material reviewed. Status: The official sources are not aligned. There is insufficient authority to conclude either:
- that the old Tourist Home standards remain applicable to 2026 Homestays; or
- that the 2026 Guidelines extinguished every older definition/classification provision. Affected properties: every project whose viability depends on room count, local residency, resident-host status, classification grade or non-owner management. Authority to resolve: Director, Department of Tourism, UTLA, Kavaratti; request the current consolidated homestay rulebook and express status of all earlier Tourist Home guidelines.
Conflict 3 — “FSSAI License” versus current national Registration/Licence structure
Source A: Lakshadweep 2026 Guidelines say “FSSAI License shall be mandatory for facilities serving food.” [S1, Part A(v)] Source B: FSSAI's 27 March 2026 official implementation FAQ expressly provides a Registration category up to ₹1.5 crore turnover, State Licence above that through ₹50 crore, and Central Licence above ₹50 crore. [S15, Q2] Status: The official sources are not aligned in terminology. It should not be assumed that the Lakshadweep Department intended to exclude a legally valid FSSAI Registration. Affected properties: small homestays serving meals. Authority to resolve: Tourism Department and Lakshadweep Food Safety authority/FSSAI — obtain written confirmation whether an FSSAI Registration satisfies Part A(v).
Conflict 4 — Public Trade Licence implementation pages
The current descriptor for the 31 July 2026 Trade Licence service shows an active Individual/online-kiosk workflow and a one-week service metric. Other indexed application endpoints return “Service Under Modification.” [S9] Status: implementation sources are not fully aligned. This does not invalidate S1's legal requirement to obtain a Trade Licence. It means the current filing channel and applicable enclosure set should be verified immediately before submission. Authority: Revenue Department / island DC or BDO.
Conflict 5 — Capital subsidy applicant scope
Source A: subsidy introduction describes promotion of micro/small enterprises for local entrepreneurs. [S18 §1] Source B: §8 says “Any individual above 18 years”, while §5 also discusses societies and SHGs. [S18 §§5, 8] Source C: the 2026 invitation refers to “eligible entrepreneurs functioning in the U.T. of Lakshadweep.” [S18 circular] Status: The official sources are not aligned for non-local/non-resident applicant scope. Affected cases: outside investors, company-led projects and capital-only participants. Authority: Director of Industries.
16 / Source register
Official source register
| ID | Issuing body | Document or portal | Document/order number | Published | Effective | Language | Status/currentness | Official URL | Pages/sections reviewed | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| S1 | Department of Tourism, UT Lakshadweep | 17873078209753.pdf — final Lakshadweep Tourist Trade Guidelines, 2026 + notice | F.No. 20/01/2026-TD | 19 Aug 2026; official notice listing published 19 Aug 2026 | 01 Sep 2026 | English | PRIMARY — CURRENT | Notice p.1; Guidelines pp.1–2, §II and §III Part A; water-sports pages checked for category spill-over | Existing-operator deadline 30 Sep 2026. | |
| S2 | Department of Tourism, UT Lakshadweep | 17759345784551.pdf — draft Tourist Trade Guidelines | F.No. 20/01/2026-TD | 11 Apr 2026 | Never established as operative; consultation draft | English | Background source only / OBSOLETE DRAFT | Notice p.1; draft Guidelines pp.1–2 | Explicitly invited comments for 30 days. Current document page still exposes this draft, so users can reach a stale version. | |
| S3 | Department of Tourism Development, UT Lakshadweep | 2020052611.pdf — Draft Lakshadweep Tourism Policy 2020 | F.No. 17/04/2007-TD (Part) / notice dated 22 May 2020 | 26 May 2020 web consultation | None located | English | Background source only / DRAFT | Tourist-home portions, proposed location/capacity/NOC/employment concepts | Never treated here as current law. | |
| S4 | Department of Tourism Development, UT Lakshadweep | 2020061724.pdf — public notice regarding Home Stays | F.No. 17/04/2007 (Part) | 16 Jun 2020 | None | English | Background source only / CONSULTATION | Notice and annexure | Expressly a consultation/reference exercise, not a current application form. | |
| S5 | UT Lakshadweep Administration | Tourism Service page | — | Current page; last updated 27 Aug 2026 | Current webpage | English | PORTAL | Public service list | Lists Tour Package and Guest House Booking; no public Tourism Trade Permit service displayed. | |
| S6 | Revenue Department, UT Lakshadweep | Revenue Department / citizen services | — | Current page | Current | English | IMPLEMENTATION / CONTACT | Land administration/service description | Revenue handles land records, land permissions and island subdivision administration. | |
| S7 | Revenue Department / ServicePlus | Land Diversion Certificate | Current ServicePlus service; listed 12 Jun 2026 | 12 Jun 2026 listing | Current public workflow | English | PORTAL | Eligibility, enclosures, delivery metric | Individual applicant; 7-day service metric excluding holidays. | |
| S8 | Public Works Department, Lakshadweep / ServicePlus | Building Permit | ServicePlus service | Listed from 28 Sep 2021; current descriptor checked 2026 | Current descriptor | English | PORTAL | Eligibility, enclosures, delivery metric | Individual applicant; 7-day metric; requires land ownership/diversion and plans. | |
| S9 | Revenue Department / ServicePlus | Trade License Certificate | Current service listed 31 Jul 2026 | 31 Jul 2026 | Current descriptor | English | PORTAL / IMPLEMENTATION | Applicant type, dynamic enclosures, delivery metric | Individual; 1-week metric. Portal contains repeated/conditional fields and some related endpoints show “Service Under Modification.” | |
| S10 | UT Lakshadweep Administration | ePermit portal | — | Current portal checked 05 Sep 2026 | Current | English | PORTAL | Homepage, fees, refund and contact pages | Tourist sponsor/PCC no longer required; separate guest-access regime. | |
| S11 | Government of India / Lakshadweep Administration | Laccadive, Minicoy and Amindivi Islands (Restriction on Entry and Residence) Rules, 1967 | 1967 Rules | 1967 | 01 Oct 1967 per Rule 1 | English | PRIMARY / STILL REFERENCED BY CURRENT PORTAL | Rules 1–10, especially Rules 3–10 | Current ePermit portal expressly operates by reference to these Rules. | |
| S12 | Ministry of Home Affairs | Immigration and Foreigners Rules, 2025 | G.S.R. 596(E) | 01 Sep 2025 | 01 Sep 2025 | English/Hindi Gazette | CENTRAL — CURRENT | Rule 17; Form III | “Home stay” expressly within accommodation. | |
| S13 | Bureau of Immigration / FRRO | Form C / Form III accommodator portal | — | Current | Current | English | CENTRAL / PORTAL | Public login/registration interface | Operational portal for foreigner accommodation reporting. | |
| S14 | MoEFCC | Island Coastal Regulation Zone Notification, 2019 and legal repository | S.O. 1242(E), 08 Mar 2019; later amendments including S.O. 5494(E), 24 Nov 2022 | 2019 onwards | Subject to IIMP/ICRZ implementation architecture | English/Hindi | CENTRAL / PRIMARY | Principal notification and amendment history | Exact property zoning must be checked against current approved/applicable island plan; no generic setback inferred here. | |
| S15 | FSSAI | 69c6a23234827order_27032026.pdf — FAQs on 2026 Licensing and Registration amendments | File No. RCD-01002/1/2021-Regulatory-FSSAI-Part(1) | 27 Mar 2026 | Turnover thresholds 01 Apr 2026 | English/Hindi | CENTRAL — CURRENT | Cover; Annexure Q1–Q4 | Registration/licence distinction and perpetual validity. | |
| S16 | CBIC | Central Goods and Services Tax Act, current official web text | CGST Act 2017 | 2017; current official text consulted | As amended | English | CENTRAL | §§22–25 | Used only to distinguish statutory tax-registration rules from Lakshadweep's separate GSTIN permit prerequisite. | |
| S17 | UT Lakshadweep Administration | Administrative Setup; Village & Panchayats; current directory | — | Current, last updated Aug 2026 | Current | English | CONTACT / IMPLEMENTATION | · · | District/subdivision/Panchayat/contact structure | One district; island-level DC/SDO/BDO structure. |
| S18 | Directorate of Industries, UT Lakshadweep | 17848947799783.pdf — 25% Capital Investment Subsidy, 2026–27 | F.No. 7/2/2026-IND/374 | 13 Jul 2026 | 2026–27 invitation; applications due 31 Aug 2026 | English | IMPLEMENTATION / FUNDING | Circular p.1; enclosed Guidelines §§1–10 | Application window reviewed was closed by research date. | |
| S19 | Ministry of MSME | Udyam Registration portal | — | Current portal; data dated 04 Sep 2026 | Current | English | CENTRAL / PORTAL | Registration rules and applicant forms | Free, paperless; company/LLP etc recognised for Udyam purposes, which does not establish tourism-permit eligibility. |
Review and corrections
Keep the guide current.
Sources were checked on . Recheck the live application route before filing because portals and implementation instructions can change.
Send a correction with the relevant official source. Browse all states and Union territories.